INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
Form 1 Development Application
Part E
Building &/or operational works assessable
against a planning scheme
‘Nature of the works |
4. Nature of work that requires assessment against a planning scheme:
[_] Building work - Complete Table A ({X] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
X] Roadworks (J Stormwater ([] Water infrastructure [-] Sewerage infrastructure
[[] Landscaping ([] Earthworks (_] Drainage Works (] Signage
(LJ Clearing vegetation under the planning scheme ([] Other - Specify below
(ii) What type of approval is being sought? (NOTE: if you have indicated muttiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
[X] Development Permit ([] Preliminary approval (J Both (Specify betow)
(iti) Is the operational work necessary to facilitate the creation of new lots {i.¢. subdivision)?
[XJ No [J Yes - Specify the number of lots being created
{iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
()No — [X] Yes - Complete Table B(a)
Table B(a) List of approval references Date approved Date approval lapses (if known)
1
Table B
(i) Whatis the nature of the operational work?
( Roadworks LX] Stormwater (_] Water infrastructure (_] Sewerage infrastructure
( Landscaping ([] Earthworks [_] Drainage Works L] Signage
[[] Clearing vegetation under the planning scheme [-] Other - Specify below
(ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
Development Permit (Preliminary approval J Both (Specify batow)
{iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
IX] No [J Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)
[No — [X] Yes - Complete Table Ba)
Table B(a) . List of approval references Date approved | — Date approval laps es (known)
1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published]Related documentApplication case desk ↗
About this file
- File size
- 11.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.