Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

08/1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published] · 142008.1056

of 73

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

 

Table B
(i) What is the nature of the operational work?
(-) Roadworks ) Stormwater L Water infrastructure [-] Sewerage infrastructure
(J Landscaping BX] Earthworks ([] Drainage Works 1 Signage
(_] Clearing vegetation under the planning scheme (] Other - Specify below

(ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

[X] Development Permit CJ] Preliminary approval (] Both (Specify below)
(iii) Is the operational work necessary to facilitate the creation of new lots (i.e. subdivision)?
—X}No _[[] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

[J No — &X] Yes - Complete Table B(a)

 

Table B(a) ; List of approval references - ‘| Date approved Date approval lapses (if known)
1

 

 

 

 

 

 

 

 

 

2. What is the dollar value of this operational work? (i.e. the total value including GST, materials and labour) | $

 

 

 

‘Mandatory Information “

 

3. Confirm that the following mandatory information accompanies this application

 

 

 

 

 

 

 

 

 

 

oedremeet of Method of lodgement
Plans, andspecticaions if applicable, showing the nature and location of the proposed works (including the [2] Confirmed | over the counter
OFFICE USE ONLY
Date Received Reference Numbers

 

 

 

 

Advice for completing Part E

General advice
« Part A must also be completed for all IDAS development applications.
* The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

 

1 A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur,

 

 

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_1056 - Operational Works - Roadworks, Stormwater & Earthworks [As Published].pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.