Skip to the record
Accept no substitutions.

Original source · versioned page text

Town Planning Assessment Report

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

6.0 SUPPORTING INFORMATION
The following section provides a summary of the supporting information relating to the proposed
development:

                                 Documentation for Approval
    Plan No.      Rev.                         Plan Title                            Date
     WD.101        DA    Cover Sheet, prepared by Aboda Design Group              19.11.2021
     WD.102        DA    GFA and Site Cover, prepared by Aboda Design Group       19.11.2021
     WD.201        DA    Main Level Plan, prepared by Aboda Design Group          19.11.2021
     WD.202        DA    Mezzanine Plan, prepared by Aboda Design Group           19.11.2021
     WD.203        DA    Roof Plan, prepared by Aboda Design Group                19.11.2021
     WD.501        DA    Elevations, prepared by Aboda Design Group               19.11.2021
     WD.601        DA    Sections, prepared by Aboda Design Group                 19.11.2021
 2123-SBSMP-01     1.0   Site Based Stormwater Management Plan, prepared by       19.10.2021
                         Barlow Shelley Consulting Engineers
    2123-R01        A    Locality Plan and Schedule of Drawings, prepared by      15.12.2021
                         Barlow Shelley Consulting Engineers
    2123-R02        A    Existing Site Conditions, prepared by Barlow Shelley     15.12.2021
                         Consulting Engineers
    2123-R03        A    Overall Layout Plan, prepared by Barlow Shelley          15.12.2021
                         Consulting Engineers
    2123-R04        A    Earthworks Layout Plan, prepared by Barlow Shelley       15.12.2021
                         Consulting Engineers
    2123-R05        A    Earthworks Sections, prepared by Barlow Shelley          15.12.2021
                         Consulting Engineers
    2123-R06        A    Roadworks and Stormwater Drainage Detail Plan,           15.12.2021
                         prepared by Barlow Shelley Consulting Engineers
    2123-R07        A    Bio Retention Basin Layout Plan Details and Sections,    15.12.2021
                         prepared by Barlow Shelley Consulting Engineers
    2123-R08        A    Stormwater Drainage Catchments, prepared by Barlow       15.12.2021
                         Shelley Consulting Engineers
    2123-R09        A    Concrete Jointing Layout Plan and Associated Details,    15.12.2021
                         prepared by Barlow Shelley Consulting Engineers
    2123-R10        A    Vehicle Turning Templates, prepared by Barlow Shelley    15.12.2021
                         Consulting Engineers




                                                                                            17
Log in to download the original file

Town Planning Assessment Report.pdf · 10.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.