Town Planning Assessment Report
Very large file: it may take a few minutes
The original of this document is very large (10.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
more: a loading 1. one locker per
bay for a two bicycle
semi-trailer of parking
15m x 3.6m and spaces; and
on site 2. one shower
manoeuvring for cubicle with
a semi- trailer ancillary
change room
per ten bicycle
spaces or part
thereof.
Required 33 car parks: 1 8 A loading bay for 9 + end-of-trip
Caretaker’s a semi- trailer of facilities
Accommodation 15m x 3.6m and
covered park + 32 on site
Low Impact manoeuvring for
Industry parks a semi- trailer
Proposed 39 car parks: 1 8 A loading bay for Accommodated
Caretaker’s a semi- trailer of in hardstand
Accommodation 15m x 3.6m and areas +
covered park + 38 on site end-of-trip
Low Impact manoeuvring for facilities within
Industry parks a semi- trailer tenancies
The proposed parking is considered sufficient to satisfy the proposed development as outlined above.
Particularly, the development makes efficient use of what site area is available and exceeds the
minimum car parking requirements by providing a surplus of six car parking spaces. A semi-trailer
bay is provided on the driveway adjacent to Unit 11. Refer to swept paths prepared by Barlow Shelley
Consulting Engineers which confirms a B85 and HRV can appropriate manoeuvre on and off the site in
a forward manner.
3.4 INFRASTRUCTURE AND SERVICES
Waste will be stored at the front of the site adjacent to the driveway, and will be screened
appropriately. Waste will be collected onsite on the nominated date of collection by a waste collection
vehicle. A waste collection vehicle can enter and exit the site in a forward manner.
The site can be connected to all essential services.
The site can be connected to a legal point of discharge via Council’s existing controlled open drain
within the drainage reserve south of the development site. A stormwater retention basin is located in
the south-western corner of the site. Refer to the Engineering Plans and Site Based Stormwater
Management Plan prepared by Barlow Shelley Consulting Engineers for further details.
3.2 OPERATIONAL WORKS
The application seeks Operational Works approval for proposed civil and landscaping works in
accordance with the attached documentation. The attached documentation has been prepared by
specialist consultants in accordance with the relevant sections of Noosa Plan 2020.
Conditions for the approved subdivision dictate that any future development on this lot will need to be
in accordance with an operational works application including "industry approved water quality
modelling which demonstrates the respective development will achieve no worsening of water
quality."
8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.