Also conditioned is that a 30m long grassed swale on the subject site, near the southeastern corner of
the lot, is to be established and maintained generally to the specifications on the approved Civil Plans.
Refer to the Engineering Plans prepared by Barlow Shelley Consulting Engineers for further details.

Condition 8.
      Driveway runoff must be directed via a grassed stormwater polishing swale in proposed Lot 4,
      established and maintained with dimensions 30m long, min grade 1%, min 300mm deep, 1 in 4
      sides and grass growth maintained between 0.05m and 0.5m, generally as shown on
      Stormwater Drainage Catchment Plan for Proposed Industrial Development at 1 Taylor Court,
      Cooroy for Bullgate Pty Ltd Job No 2023 Drawing Number R10 Rev B dated 14 October 2020.

Condition 12.
        Site stormwater drainage and driveway runoff must be directed via a grassed stormwater
        polishing swale established on Lot 4 and maintained with dimensions 30m long, min grade
        1%, min 300mm deep, 1 in 4 sides and grass growth maintained between 0.05m and 0.5m,
        generally as shown on Stormwater Drainage Catchment Plan for Proposed Industrial
        Development at 1 Taylor Court, Cooroy for Bullgate Pty Ltd Job No 2023 Drawing Number
        R10 Rev B dated 14 October 2020, prepared by Barlow Shelley Consulting Engineers.

Condition 21.
      Drainage easement/s encompassing stormwater drainage infrastructure to facilitate
      maintenance and runoff from the access road to, and including, the stormwater polishing swale
      on Lot 4 must be established prior to sealing of the survey plan and allocated in favour of
      benefitted lots whose owners will be responsible for all the maintenance needs in accordance
      with the terms of the easement/s which shall reflect these requirements.

Condition 54.
      During construction and establishment of the polishing swale on Lot 4, the supervising RPEQ
      must certify forms contained in section 3.15 of the Construction and Establishment Guidelines:
      Swales, Bioretention Systems and Wetlands (Water by Design, 2009). These forms and
      certification must be submitted to council prior to the sealing of the survey plan.




                                                                                                       9
Log in to download the original file

Town Planning Assessment Report.pdf · 10.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.