Response to Info Request -Attachment 7 - Bushfire Report MCU18-0015 & RAL18-0001 · MCU18/0015
property subject to bushfire risk; and fragments, demonstrated to be viable without exceeding BAL
b) maximise the protection of people and 29 construction under AS3959-2009.
property during the passage of a fire
front.
8.5 (O8) An adequate water supply is The use is in an municipal water service area and access to
provided for fire fighting purposes. hydrant supply points shall be available in accordance with
AS2419.1-2005.
8.6 (O9/O11) Firebreaks and fire access The narrow fragment of retained fuel is such that fire breaks
tracks provide – and fire trails are not warranted, with construction and APZs
a) adequate access for fire fighting and providing suitable protection for buildings, and access to the
other emergency vehicles; and edge of unmanaged vegetation.
b) adequate width to minimise the risk of
fire crossover.
8.7 (O10) The safety of people and Solution 10.3 is applied to the extent that additional Lots
property are maintained by have not resulted in their only vehicular access route being
a) Location house site areas and other through a Medium or High Bushfire Hazard area shown on
sensitive uses on that part of the land overlay map OM9.4.
least affected by the bushfire hazard; and
b0 fire mitigation methods are used that
are adequate for the Potential Bushfir
Hazard rating of the individual site,
having regard to-
i. Vegetation type
ii. Slope
iii. Aspect
iv. On site and off site fire
hazard implications of the
development
v. Bushfire history
vi. Conservation values of the
site; and
vii. Ongoing maintenance.
8.8 (O12) Road network provides for safe Whilst the internal road provided is not a through road, it
and effective evacuation of users of provides adequate access and egress for what is only a small
premises and access by Emergency and narrow strip of retained unmanaged vegetation, and
services. such route is in a safe location and direction; and
S12.2 Roads have a gradient below 12.5%.
8.9 (O13) Lot design and building siting Solution S13.1 is applied to the extent that new Lots 2 and 4
minimises bushfire hazard to people and a) include a house site area identified on the plan of
property having regard to slope, aspect, subdivision;
existing vegetation and adequate b) of sufficient size and dimensions to accommodate a
separation from hazardous vegetation. dwelling and ancilliary buildings and use areas; and
S13.2 allow for efficient emergency access to buildings for fire
fighting appliances.
Furthermore future dwellings shall be constructed in
accordance with Method 2 under AS3959-2009 , as
objectively demonstrated by Section 6.3 of this Plan, and BAL
29 construction is not exceeded.
Report compiled by Bushfire Risk Reducers for Innovative Planning Solutions Page 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Info Request -Attachment 7 - Bushfire Report MCU18-0015 & RAL18-0001.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.