       Proposal Details:           1. Removal of approximately 7975 square metres of marine plants including marine
                                   dead wood to enable the nourishment of the foreshore with approximately 9000
                                   cubic metres of sand and establish a site access track:

                                   2. Construction of a permanent waterway barrier being an 80 metre long submerged
                                   channel closure, and

                                   3. Construction of a permanent waterway barrier being a 240 metre wall and groyne.

                                   Associated with the Noosa River Spit Erosion protection Works specifically, Stage 1
                                   works as shown on the following attached copies of submitted International Coastal
                                   Management drawings:

                                   Number NRS-002 titled PROPOSED STAGE 1 WORKS and dated 1/04/2011

                                   Number NRS-003 titled SUBMERGED CLOSURE LAYOUT and dated 1/04/2011

                                   Number NRS-004 titled SUBMERGED CLOSURE TYPICAL CROSS-SECTION and
                                   dated 1/04/2011

                                   Number NRS-005 titled WALL AND GROYNE LAYOUT and dated 1/04/2011

                                   Number NRS-006 titled GROYNE TYPICAL CROSS-SECTIONS and dated
                                   1/04/2011

                                   Number NRS-007 titled WALL TYPICAL CROSS-SECTION and dated 1/04/2011

                                   Number NRS-008 titled DREDGE AREA LAYOUT and dated 1/04/2011

                                   Number NRS-009 titled DREDGE AREA TYPICAL PROFILE and dated 1/04/2011

                                   Number NRS-010 titled NOURISHMENT TYPICAL PROFILE and dated 1/04/2011

                                   Number NRS-01 1 titled NOTES and dated 1/04/2011

                                   number NRS-012 titled AFFECTED VEGETATION and dated 5/04/2011



       Location:                   Within the bed and banks of the Noosa River (within and adjacent to the area
                                   described as the Noosa River Spit, Lot 114 MCH839107) as shown on attached
                                   copy of submitted International Coastal Management drawing number NRS-002
                                   titled PROPSED STAGE 1 WORKS and dated 1/04/2011.



2      Written notice of the date of commencement of fisheries development works must be provided
       to the District Officer, Queensland Boating and Fisheries Patrol (Fax. No. 5449 7276) and the
       Manager, Planning and Assessment, Fisheries Queensland (Email:
       [email protected]), at least five (5) business days but no greater than
       twenty (20) business days prior to the commencement of fisheries development works.
3      At least three (3) signs must be displayed around the development works site, including one at
       the main entrance to the property, in positions where the signs are clearly visible to the public,
       for at least five (5) business days prior to the commencement, during and for 5 business days
       after all fisheries development works. Signs are to be removed 5 business days after the
       completion of the works. Each sign must state: "Works (Operational works that is constructing
       or raising waterway barrier works and operational works that is the removal, destruction or
       damage of marine plants) authorised under Development Approval Conditions. Fisheries
       Queensland Reference number 2011 DB0083. Fisheries Queensland telephone (07) 5449
       7555".
4      For the purposes of section 145 (c) (ii) of the Fisheries Act 1994 the place where works will
       take place is a place required to be open for inspection.
5      All marine plants authorised for removal and other material used in the development that does
       not form part of the approved structures (e.g. debris, construction material, soil, etc.) are to be
       removed from the intertidal zone.




                                                                                                     I,,:'. e ......
                                                                                                     Delegate of the
                                                                                                                       !% ..............



                                                                                                     Chief Executive


                                                                                                     Date.11141, .......

Department of Employment, Economic Development and Innovation                                                      Page 2 of 3

Used in these records

About this file

File size
4.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

DEEDI Approval to request to change and existing development approval.pdf · 4.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.