Council archive · source document
DEEDI Approval to request to change and existing development approval · OPW11/0116
Proposed Stage 1 Works:
• Retain existing rock wal [maintain I
upgrade]
• Widening of existing footpath for
construction access
• Northern section of submerged
channel closure
• Wag at end of Noosa River Spit
• Groyne / Training Wall
• Dredging for interim navigation
• Removal of dead trees (marine plants)
as required
• Foreshore nourishment
• Monitoring programme
Existing footpath [to be widened for
2. Hydrographic survey by SCRC on 23rd
construction access]
November 2010.
3. Works to be undertaken in accordance ,
"Noose River Spit Concept Environment
Submerged channel closure to, Management Plan" prepared by ICM.
limit channel migration [see
drawing -003 & -004 for details] 4. Drawings to be read in conjunction with
Notes on drawing NRS-01 1.
Groyne I Training Wall to limit
channel migration [see drawing
-005 & -006 for details)
LEGEND
Structure Crest
Structure Toe I
Dredge Area I I
Nourishment Area
RP Boundary
VF0.11gv DArurv AID NuM 7ovIM1I Ul.1 U,I'. 1.19A
Wall [see drawing International
^-005 & -007 for details]
Coastal
0.
y Extent of
Management
ed ^- Mangrove IAgMe eats 4 r, UI:, root Ae
':F. r::E --I :r:41;61 LLX
IPFF_illi ^...%Uahimr xalttm.a
PRO;EC1 NAI'
NOOSA RIVER SPIT
PROPOSED STAGE 1 WORKS
ervisl x
NRS-002 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
DEEDI Approval to request to change and existing development approvalRelated documentApplication case desk ↗
About this file
- File size
- 4.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.