Skip to the record
Every meeting, every word.

Original source · versioned page text

20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1)

Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.

Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Figure 14-15 Lake Macdonald 90-Day Detention Zone & within 400m of Ponded Water




                                                                                                                                  Including amendments to 8 June 2018
                                                                                                                 The Noosa Plan
Editor’s notes

Erosion and sediment control
Persons undertaking development, including building work such as building a Detached house, are required
under the Environmental Protection (Water) Policy 1997 (EPP) to ensure that sediment and other material
including building waste, sawdust, concrete, cement or paint are not deposited or released into a roadside
gutter, stormwater drain or water or into a place where it could reasonably be expected to move or be washed
into a roadside gutter or stormwater drain or that water is not washed from the site. Council enforces the EPP
and penalties may apply.
Plumbing and drainage
An approval will be required from Council’s Plumbing Section for all plumbing and drainage works.
Non-compliance with alternative provisions to the QDC
Code assessment is not required for additions/alterations/extensions that do not comply with an alternative
provision to the QDC. However, an application to Council seeking approval for variation of the alternative
provision is required.




                                                    14-111
                                             Building Works Code
Log in to download the original file

20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1).pdf · 3.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.