20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1)
Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.
Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.
Figure 14-15 Lake Macdonald 90-Day Detention Zone & within 400m of Ponded Water
Including amendments to 8 June 2018
The Noosa Plan
Editor’s notes
Erosion and sediment control
Persons undertaking development, including building work such as building a Detached house, are required
under the Environmental Protection (Water) Policy 1997 (EPP) to ensure that sediment and other material
including building waste, sawdust, concrete, cement or paint are not deposited or released into a roadside
gutter, stormwater drain or water or into a place where it could reasonably be expected to move or be washed
into a roadside gutter or stormwater drain or that water is not washed from the site. Council enforces the EPP
and penalties may apply.
Plumbing and drainage
An approval will be required from Council’s Plumbing Section for all plumbing and drainage works.
Non-compliance with alternative provisions to the QDC
Code assessment is not required for additions/alterations/extensions that do not comply with an alternative
provision to the QDC. However, an application to Council seeking approval for variation of the alternative
provision is required.
14-111
Building Works Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.