Skip to the record
For the highest quality transcripts.

Original source · versioned page text

20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1)

Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.

Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                         column 1                                                 column 2
                 Including amendments to 8 June 2018




                                                                     Specific Outcomes                        Probable solutions (if code assessment)
The Noosa Plan



                                                                                                           S1.2 Construction works are designed and
                                                                                                           managed to restrict the extent of clearing and
                                                                                                           soil exposure to that necessary for access, and
                                                                                                           safe construction;
                                                                                                           AND
                                                                                                           S1.3 Clean stormwater is diverted or managed
                                                                                                           around or through the site without increasing the
                                                                                                           concentration of total suspended solids or other
                                                                                                           contaminants in the flow and without causing
                                                                                                           erosion (onsite or offsite);
                                                                                                           AND
                                                                                                           S1.4 Cleared areas are effectively stabilised
                                                                                                           prior to rainfall if works are delayed or works are
                                                                                                           not intended to occur immediately;
                                                                                                           AND
                                                                                                           S1.6 For buildings,
                                                                                                           a)     upstream runoff must be diverted around
                                                                                                                  the construction site; and
                                                                                                           b)     sediment barriers are provided downslope
                                                                                                                  of disturbed areas to prevent sediment
                                                                                                                  washing into gutters, drains and
                                                                                                                  watercourses either on or off the site; and
                                                                                                           c)     exposed soil and construction access
                                                                                                                  must be managed in accordance with
                                                                                                                  International Erosion Control Association
                                                                                                                  Best Practice Erosion and Sediment
                                                                                                                  Control (BPESC) 2008; and
                                                                                                           d)     temporary or permanent downpipes are
                                                                                                                  connected to the stormwater system
                                                                                                                  before laying the roof; or
                                                                                                           e)     localised erosion is avoided by directing
                                                                                                                  flow from downpipes over non-erosive
                                                                                                                  areas.
                                                       O2 Works in a watercourse                           S2.1 Work within waterways must be
                                                       Construction activities within watercourses are     undertaken in accordance with Best Practice
                                                       planned to prevent erosion, construction failure    Erosion and Sediment Control, Appendix I –
                                                       and associated sedimentation.                       Instream works, Sections 14 and 16
                                                                                                           International Erosion Control Association 2008.

                                                                                                           S2.2 Temporary vehicular crossings of
                                                                                                           waterways must be designed and constructed to
                                                                                                           convey flows for the 50%AEP event and remain
                                                                                                           stable for all rainfall events up to 10%AEP
                                                                                                           event.




                                                                                                       14-130
                                                                                          Erosion and Sediment Control Code
Log in to download the original file

20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1).pdf · 3.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.