Original source · versioned page text
Part 14 Codes PIP to LGIP 8 June 2018
Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.
Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
column 1 column 2
Including amendments to 8 June 2018
Specific Outcomes Probable solutions (if code assessment)
The Noosa Plan
Figure 14-41 Pneumatic Float
Figure 14-42 Pneumatic Float (Platform)
Figure 14-43 Floating Pontoon
14-173
Watercourses Works Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.