Original source · versioned page text
20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1)
Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.
Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.
Division 11—Building Works Code
Including amendments to 8 June 2018
The Noosa Plan
14.89 Building Works Code
The provisions in this division comprise the Building Works Code. They are—
compliance with the Building Works Code (Section 14.91);
overall outcomes for the Building Works Code (Section 14.92);
Alternative provisions to the QDC (Section 14.93);
specific outcomes, acceptable solutions and probable solutions for the Building
Works Code (Sections 14.94–14.102).
14.90 Compliance with the Building Works Code
Development that is consistent with the specific outcomes in sections 14.94 - 14.102
complies with the Building Works Code.
14.91 Overall outcomes for the Building Works Code
14.91.1 The overall outcomes are the purpose of the Building Works Code.
14.91.2 The overall outcomes sought by the Building Works Code are to ensure that building
works—
a) offer high levels of amenity and safety for users;
b) are sited to minimise risk to users; and
c) are sited and have a built form consistent with other buildings and structures in the vicinity.
14.92 Alternative provisions to the QDC
The following provisions are alternative provisions for the purposes of Section 10 of the
Building Regulation 2006 and Section 33 of the Building Act 1975 —
a) O1 and S1.1; and
b) O11 and S11.1 and S11.2.
14.93 Specific outcomes, acceptable solutions and probable solutions for
the Building Works Code
The specific outcomes sought for the Building Works Code are included in column 1 of
Table 14-44 to Table 14-47. Acceptable solutions for accepted development subject to
requirements and probable solutions for code assessment development are included in
column 2 of Table 14-44 to Table 14-47.
14-99
Building Works Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.