Engineering Report & Stormwater Management Plan
Date: 22/09/2016 Document No.: 16144-ENG-01.Docx
By: MRS Revision No.: A
The parameters used as the MUSIC Rainfall-Runoff Parameters are shown below in Table 5.4, and
were derived from Table 3.7 of the MUSIC Modelling Guidelines prepared by Water by Design
(2010).
PARAMETER COMMERCIAL
Rainfall Threshold (mm) 1
Soil Storage Capacity (mm) 18
Initial Storage (% Capacity) 10
Field Capacity (mm) 80
Infiltration Capacity Coefficient - a 243
Infiltration Capacity Exponent – b 0.6
Initial Depth (mm) 50
Daily Recharge Rate (%) 0
Daily Baseflow Rate (%) 31
Daily Deep Seepage Rate (%) 0
Table 5.4: MUSIC Rainfall-Runoff Parameters
Treatment parameters for the in-ground proprietary systems have been provided by the
manufacturer. Refer to Appendix F for the Stormwater360 Operations and Maintenance
Manual.
Alternative In-Ground Proprietary System
The proposed in-ground proprietary system documented within this report is the
Stormwater360 Stormfilter cartridge system. At the time of preparing this report the
Stormwater360 Stormfilter system was the only system that is approved for use by Noosa
Council. However discussions with council have indicated that an alternative product may be
used if the alternative product does become approved for use. Based on these discussions it is
assumed that subject to their approval, council may accept a change in the proprietary
product used.
A PO Box 26, Carina Q 4152 10 | P a g e
E [email protected]
W www.vtce.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (EngSWMP.PDF)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.