Skip to the record
For the highest quality transcripts.

Original source · versioned page text

EngSWMP

Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).

of 94

Page text read automatically using OCR, there may be inaccuracies

                                             1 Memorial Avenue Tewantin, QLD 4565
                                                             State Planning Policy April 2016 – Water Quality
                                                        Performance Outcome Criteria and Acceptable Outcomes


                  Performance outcomes                                          Acceptable outcomes                                                  Solution
                                                                 designed, installed, constructed, operated, monitored
                                                                 and maintained, and any other erosion and sediment
                                                                 control practices are carried out in accordance with local
                                                                 conditions and appropriate recommendations from a
                                                                 suitably qualified person, or
                                                                 AO6.3
                                                                 The ESCP demonstrates how stormwater quality will be
                                                                 managed in accordance with an acceptable regional or
                                                                 local guideline so that target contaminants are treated to
                                                                 a design objective at least equivalent to Acceptable
                                                                 Outcome AO6.1.

7   PO7                                                          AO7.1                                                        SO7.1
    Operational activities for the development avoid or          Development incorporate stormwater flow control              Not applicable as a waterway is not proposed for this
    minimises changes to waterway hydrology from adverse         measure to achieve the design objectives set out below       development.
    impacts of altered stormwater quality and flow.              in and Table B (post construction phase). The operational
                                                                 phases for the development comply with design
                                                                 objectives in Table B (post construction phase), or
                                                                 current best practice environmental management,
                                                                 including management of frequent flows, and peak flows.

8   PO8                                                          AO8.1                                                        SO8.1
    Any treatment and disposal of waste water to                 Implement the WWMP prepared in accordance with               Not applicable as a waterway is not proposed for this
    a waterway accounts for:                                     AO2.1                                                        development.
       the applicable water quality objectives for the
        receiving waters, and
       adverse impact on ecosystem health or receiving
        waters, and
       in waters mapped as being of high ecological value,
        the adverse impacts of such releases and their offset.

9   PO9                                                          AO9.1                                                        SO9.1
    Wastewater discharge to a non-tidal artificial waterway is   Wastewater discharge to non-tidal artificial waterways is    Not applicable as a waterway is not proposed for this
    managed in a way that maintains ecological processes,        managed to avoid or minimise the release of nutrients of

Log in to download the original (EngSWMP.PDF)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.