Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

EngSWMP

Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).

of 94

Page text read automatically using OCR, there may be inaccuracies

                                             1 Memorial Avenue Tewantin, QLD 4565
                                                             State Planning Policy April 2016 – Water Quality
                                                        Performance Outcome Criteria and Acceptable Outcomes


                   Performance outcomes                                        Acceptable outcomes                                                   Solution
     riparian vegetation, waterway integrity, and downstream   concern so as to minimise the occurrence, frequency and        development.
     ecosystem health.                                         intensity of coastal algal blooms, and
                                                               AO9.2
                                                               Development in coastal catchments avoids or minimises
                                                               and appropriately manages soil disturbance or altering
                                                               natural hydrology, and
                                                               AO9.3
                                                               Development in coastal catchments:
                                                               a. avoids lowering groundwater levels where potential or
                                                               actual acid sulfate soils are present, and
                                                               b. manages wastewaters so that
                                                               (i) the pH of any wastewater discharged is    maintained
                                                               between 6.5 and 8.5 to avoid mobilisation of acid, iron,
                                                               aluminium, and metals, and
                                                               (ii) holding times of neutralised wastewaters ensures the
                                                               flocculation and removal of any dissolved iron prior to
                                                               release, and
                                                               (iii) visible iron floc is not present in any discharge, and
                                                               (iv) precipitated iron floc is contained and disposed of,
                                                               and
                                                               (v) wastewater and precipitates that cannot be contained
                                                               and treated for discharge on site are removed and
                                                               disposed of through tradewaste or another lawful
                                                               method.

10   P10                                                       A10.1                                                          S10.1
     Any non-tidal artificial waterway is managed and          Any non-tidal artificial waterway is designed, constructed     Not applicable as a waterway is not proposed for this
     operated by suitably qualified persons to achieve water   and managed under the responsibility of a suitably             development.
     quality objectives in natural waterways.                  qualified registered professional engineer, Queensland
                                                               (RPEQ) with specific experience in establishing and

Log in to download the original (EngSWMP.PDF)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.