EngSWMP
Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).
1 Memorial Avenue Tewantin, QLD 4565
State Planning Policy April 2016 – Water Quality
Performance Outcome Criteria and Acceptable Outcomes
Performance outcomes Acceptable outcomes Solution
f. identifies funding sources for the above, including
bonds, headworks charges or levies.
Table A: Construction phase—stormwater management design objectives
Application
Applies to all climatic regions.
Issue Design Objectives
Temporary 1. Design life and design storm for temporary drainage works:
Drainage Control
drainage • Disturbed area open for <12 months—1 in 2-year ARI event
works • Disturbed area open for 12–24 months—1 in 5-year ARI event
• Disturbed area open for > 24 months—1 in 10-year ARI event
2. Design capacity excludes minimum 150 mm freeboard
3. Temporary culvert crossing—minimum 1 in 1-year ARI hydraulic capacity
Erosion 1. Minimise exposure of disturbed soils at any time
Erosion Control
control measures 2. Divert water run-off from undisturbed areas around disturbed areas
3. Determine the erosion risk rating using local rainfall erosivity, rainfall depth, soil-loss rate or
other acceptable methods
4. Implement erosion control methods corresponding to identified erosion risk rating
Sediment control 1. Determine appropriate sediment control measures using:
Sediment Control
measures • potential soil loss rate, or
• monthly erosivity, or
• average monthly rainfall
2. Collect and drain stormwater from disturbed soils to sediment basin for design storm event:
• design storm for sediment basin sizing is 80th% five-day event or similar
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (EngSWMP.PDF)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.