Attached to the e-mail Response to Information Request MCU16/0079 (email 2 of 3).
1 Memorial Avenue Tewantin, QLD 4565
State Planning Policy April 2016 – Water Quality
Performance Outcome Criteria and Acceptable Outcomes
Design storm for 3. Site discharge during sediment basin dewatering:
sediment • TSS < 50 mg/L TSS, and
control basins • Turbidity not >10% receiving waters turbidity, and
• pH 6.5–8.5
Sediment basin
dewatering
Litter and other waste, 1. Avoid wind-blown litter; remove gross pollutants
Water quality
hydrocarbons and other 2. Ensure there is no visible oil or grease sheen on released waters
contaminants 3. Dispose of waste containing contaminants at authorised facilities
Changes to the natural 1. For peak flow for the 1-year and 100-year ARI event, use constructed sediment basins to
Waterway stability and
waterway hydraulics attenuate the discharge rate of stormwater from the site
flood flow
and hydrology
management
Table B: Post construction phase—stormwater management design objectives
Application
(a) Applies to western Queensland and Cape York/ Far North Queensland, for population centres greater than 25,000 persons, and
(b) For all other climatic regions with population centres greater than 3000 persons.
Please refer to water quality objectives table in main report for data applicable to this application. Please refer to Table B of SPP (2014)
for complete data set.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (EngSWMP.PDF)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.