Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

L02 IR to NC

Attached to the e-mail Response to information request - RAL18/0009.

of 2

Page text shows just the words. Original shows the document exactly as it was published.

Council’s Reference:     RAL18/0009
Our Reference:           2125 L02 NG
Our Contact:             Nadine Gorton




9th May 2018



Chief Executive Officer
Noosa Council
PO BOX 141
TEWANTIN Q 4565



ATTENTION: PLANNING DEPARTMENT

Dear Sir/Madam,

RE:      RESPONSE TO INFORMATION REQUEST
Development Application – Reconfiguration of a Lot over land described as Lot 2 on RP173874
and situated at 20 Mitti Street, Noosa Heads

I refer to the above application and the information request issued by your Council and dated 8th May 2018.
This request listed 6 items that Council considers is necessary in order to complete its assessment of the
above application.

The applicant provides the following response:

Item 1:           Demonstrate that the proposed easement is sufficient to cater for the 1% AEP rain event

Applicant’s Response to Item 1: Please find attached a revised plan prepared by Complete Civil
Consulting that details the widening of Easement C to cater for calculated stormwater flows.


Item 2: Provide additional comment on how the proposed easement achieves the intent of the PSP 5
and provide comment on whether the intent is for the property owner to maintain the drainage path into
the future.

Applicant’s Response to Item 2: Complete Civil Consulting has advised that the Access & Service
Easement A and B located in Lots 1 and Lot 2 allow clear access to the Drainage Easement C for maintenance
purposes. Drainage Easement C will be maintained by the owner of Lot 1.


Item 3: Provide amended plans that clearly indicate the easements necessary to provide legal rights for
the stormwater runoff from the hardstand areas and existing dwelling on Lot 2 to discharge to the
proposed drainage easement.

Applicant’s Response to Item 3: Complete Civil Consulting has advised Access, Services and Drainage
Easements A & B have been provided to allow stormwater runoff from the existing hardstand areas and
roofwater from Lot 2 to legally discharge into Drainage Easement C.

Item 4: Provide plans that demonstrate that vehicles reversing from the carparking in the dwelling on
lot 2 can manoeuvre within the proposed boundaries and exit along the access driveway in a forward
gear. Alternatively indicate on the plans any necessary easement.

Applicant’s Response to Item 4: The revised plans prepared by Complete Civil Consulting include
manoeuvring templates for Lots 2.
Log in to download the original file

L02 IR to NC.pdf · 267 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 1 page

Page 2

   Page 2

Item 5: Provide comment on any existing or proposed agreement with the neighboring property in
regard to the use and maintenance of the shared area in the Mitti Street road reserve.

Applicant’s Response to Item 5: The applicant has advised that there is an informal agreement between
the property owners of 20 and 22 Mitti Street to share costs associated with the maintenance of the
access on the road reserve. I attach for your information a recent email regarding the apportionment of
cost associated with resurfacing of the road reserve access.


Item 6: Reconfiguration plan prepared by a surveyor that confirms existing building locations and
setbacks to proposed boundaries

Applicant’s Response to Item 6: The applicant has confirmed that the rear building has been
constructed in accordance with the approved building plans that detail a 2.0 metre rear boundary
setback to the east and a 2.0 metre side boundary to the southern boundary. Survey pegs are currently
on site on the north-eastern and south-eastern corners of the site that clearly detail the rear boundary
line and building clearance. The applicant invites officers to inspect the site to further confirm this aspect.

I further note that the aerial images from Google Earth and Councils mapping system are not accurate.


The applicant considers that they have now responded to Council’s information request. The Decision Making
Period has therefore commenced and we request that your Council proceeds with its assessment of the
application as soon as possible in accordance with the Planning Act 2016. The applicant respectfully requests
that the application be reported to the June Planning and Environment Committee meeting.

Please contact our Sunshine Coast office if you require any further information and/or clarification.


Yours faithfully,




Nadine Gorton
Senior Planner
martoo consulting pty ltd

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.