Original source · versioned page text
Reference Document - Stormwater Management Plan - RAL26/0001 (As Published)
Roof run-off from the existing dwelling is discharged to the rear of the Site as overland flows to the existing channel. Road surface flows are excluded from the Site’s catchment with the kerb and channel and crossover. FIGURE 2 SITE FRONTAGE (GOOGLE STREETVIEW, AUG 2023) FIGURE 3 EXISTING ROOF DRAINAGE TO OVERLAND FLOWS TO REAR OF THE SITE (NOV 2025)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.