NOTES
DESIGN INTENT OF PROPOSED WORKS: provide improved visitor and staff amenity to external areas - upgrade existing non compliant and stair and Delta Panel colorbond surf mist
access in courtyard 1. Remove defective and unsightly roof in level 1 courtyard 1 and balcony. Remove defective planter boxes in courtyard 1, and 2 RF New roof corrugate to both sides. depth suitable
to spans as described
replace with upgraded planter boxes. Reduce areas of metal roof and increase batten and shaded poly carbonate pergola structures to courtyards 1 and
4 3 2
2. Provide shaded seating areas in both courtyards. Provide improved visitor access to courtyards 1 and 2.
1 new bitumen rd scabble back existing and repair,
rd
surface provide new 50mm bitumen surface
prepare and paint all external walls
paint all existing
and exposed flashings, etc - 2 coats
external walls
external grade paint - white TBS
replace existing doors upgrade all soft scape area - external
to building footprint. remove all weeds
and unhealthy plants, provide new
Exit ld landscape works
sleected native ground cover to all
areas, provide new 300 deep weed free
top soil and 100 deep hoop pine mulch.
rf r removed 90m2
rf n roof new 59m2
pgn pergola new 93m2
planting area
plr 59m2
removed
pln planting area new 29m2 shown bright green
New stair, concrete with tile treads and p
facia, frameless glass balustrade - facia
fixed , stainless steel handrails. Exit works subject to Minor change
application shown blue dashed
timber
seats
p Timber seat, (spotted
gum) Aluminium frame. p
new planter 150 rendered block new planter
Timber seat, (spotted planter, drain to SW
grade paving to 35mm timber gum) Aluminium frame.
p sign Exit
below floor level seats
Exit
Exit sign
p p
new aluminium gate New paving p
61
rd
44
24
00
rd rd
4200mm
Loading bay replace existing concrete kerb with new Raised Pedestrian crossing.
24
m
new planting to
00
concrete kerb, provide re graded and new
m
New car park and shared
demolished path area
m
asphalt topping to car park area to AS 2890.6
m
45
requirements, SS bollard
m
48 49 50 51 52 53 0m 54 55 56 57 58 59 60
new planting to 0
46 demolished path area 54
4 3 2 1
47
Boundary
p
3100mm
2493 mm
ramp p
stair ramp
existing public footpath 15.0m
4800mm
new trees
reinstated planting and terrain area within boundary, Basement car park numbers - 43 New ramp and stair to comply with AS1428.1 2021 - remove existing
provide new planting - medium shrubs, ground cover. Total car park numbers after proposed adjustments to be Bottelbrush Avenue trees and vegetation, remove existing concrete ramp and handrail.
reinstated planting and terrain area within road reserve, 61 including 1 loading Bay. This conforms to condition 15 Provide new complying concrete stair and ramp with non slip tile and
provide new planting. of Development approval DNA 184 - 10 September 1990 Aluminium balustrades. 0 2000mm 5000mm 10000mm
new planting and terrain to replace existing infrastructure
FLEXURE Pty Ltd USE FIGURED DIMENSIONS. ISSUE AMMENDMENT Title
CLIENT
THE BODY CORPORATE OF NOOSA CENTRAL DO NOT SCALE FROM THE date details
PLAN G NEW
DRAWINGS. CONFIRM ALL 29.11.24 additional information - blue Date
GRANT CALDER ARCHITECTURE AND URBAN DESIGN DIMENSIONS ON SITE PRIOR clouded 11 October 2024
16.04.25 roof & planted areas
TO CONSTRUCTION OR
FABRICATION. IT REMAINS Scale
PROJECT NOOSA CENTRAL STAGE 2, 6 Bottlebrush Avenuen Noosa Junction THE CONTRACTORS
RESPONSIBILITY TO ENSURE Drawn Grant Calder
21 Bursaria Street Peregian Beach
ph: 0488 084 184 - ALTERATIONS AND IMPROVEMENTS - SCHEMATIC DESIGN COMPLIANCE WITH ALL
RELEVANT CODES AND
email - [email protected] REGULATIONS IS Checked Grant Calder
Registered Architect- BOAQ 3112 MAINTAINED AT ALL TIMES.
Drawing No GC 138 SD 05 Issue - 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.