FURTHER ADVICE - Attachment 1 - Minor Change Plans

of 10

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                 NOTES
                                                                                DESIGN INTENT OF PROPOSED WORKS: provide improved visitor and staff amenity to external areas - upgrade existing non compliant and stair and                                                                                                                            Delta Panel colorbond surf mist
                                                                                access in courtyard 1. Remove defective and unsightly roof in level 1 courtyard 1 and balcony. Remove defective planter boxes in courtyard 1, and 2                                                                                       RF     New roof               corrugate to both sides. depth suitable
                                                                                                                                                                                                                                                                                                                                                        to spans as described
                                                                                replace with upgraded planter boxes. Reduce areas of metal roof and increase batten and shaded poly carbonate pergola structures to courtyards 1 and
                                                                    4                      3                                                   2
                                                                                2. Provide shaded seating areas in both courtyards. Provide improved visitor access to courtyards 1 and 2.
                                                                                                                                                                                                                  1                                                                                                              new bitumen rd         scabble back existing and repair,
                                                                                                                                                                                                                                                                                                                          rd
                                                                                                                                                                                                                                                                                                                                 surface                provide new 50mm bitumen surface
                                                                                                                                                                                                                                                                                                                                                         prepare and paint all external walls
                                                                                                                                                                                                                                                                                                                                 paint all existing
                                                                                                                                                                                                                                                                                                                                                        and exposed flashings, etc - 2 coats
                                                                                                                                                                                                                                                                                                                                 external walls
                                                                                                                                                                                                                                                                                                                                                        external grade paint - white TBS
                                                                         replace existing doors                                                                                                                                                                                                                                                         upgrade all soft scape area - external
                                                                                                                                                                                                                                                                                                                                                        to building footprint. remove all weeds
                                                                                                                                                                                                                                                                                                                                                        and unhealthy plants, provide new
                                                              Exit                                                                                                                                                                                                                                                        ld     landscape works
                                                                                                                                                                                                                                                                                                                                                        sleected native ground cover to all
                                                                                                                                                                                                                                                                                                                                                        areas, provide new 300 deep weed free
                                                                                                                                                                                                                                                                                                                                                        top soil and 100 deep hoop pine mulch.

                                                                                                                                                                                                                                                                                                                         rf r    removed                90m2

                                                                                                                                                                                                                                                                                                                         rf n    roof new               59m2

                                                                                                                                                                                                                                                                                                                        pgn      pergola new            93m2

                                                                                                                                                                                                                                                                                                                                 planting area
                                                                                                                                                                                                                                                                                                                          plr                           59m2
                                                                                                                                                                                                                                                                                                                                 removed

                                                                                                                                                                                                                                                                                                                         pln     planting area new      29m2 shown bright green


                                                                                            New stair, concrete with tile treads and                                                                                                             p
                                                                                            facia, frameless glass balustrade - facia
                                                                                            fixed , stainless steel handrails.                                                                                                                                   Exit                                                   works subject to Minor change
                                                                                                                                                                                                                                                                                                                        application shown blue dashed
                                                                                                                                                                                                                                            timber
                                                                                                                                                                                                                                            seats

p                                                                                                                                                                     Timber seat, (spotted
                                                                                                                                                                      gum) Aluminium frame.                       p
                                                                                                                              new planter                             150 rendered block                                                                  new planter
                                                                                                                              Timber seat, (spotted                   planter, drain to SW
                        grade paving to 35mm                                                                 timber           gum) Aluminium frame.
                                                               p        sign                                                                                       Exit
                        below floor level                                                                    seats
                                                                                                                                                                                                                                                                 Exit
                                              Exit                                                                                                                                                                            sign
                          p                                                                       p
    new aluminium gate                                                                                                                    New paving                               p
                                                                                            61

                                                                                                                                                                                                                                                                                                                                                                            rd
            44




                                                                                                                                                                                                                      24
                                                                                                                                                                                                                        00
                                         rd                                                                                                                                                                                                                     rd




                                                                                                                                                                                        4200mm
    Loading bay                                                                           replace existing concrete kerb with new                     Raised Pedestrian crossing.




                                                                                                                                                                                                                              24
                                                                                                                                                                                                                         m
                                                                                                                                                                                                                                                                                                               new planting to




                                                                                                                                                                                                                                00
                                                                                          concrete kerb, provide re graded and new




                                                                                                                                                                                                                          m
                                                                                                                                                      New car park and shared
                                                                                                                                                                                                                                                                                                               demolished path area




                                                                                                                                                                                                                                     m
                                                                                          asphalt topping to car park                                 area to AS 2890.6




                                                                                                                                                                                                                                      m
            45
                                                                                                                                                      requirements, SS bollard

                                                                                                                                                                                            m
                                                                           48                         49              50               51                 52                  53          0m        54                         55                    56           57                 58                   59                          60
                                                                                                                               new planting to                                           0
           46                                                                                                                  demolished path area                                    54
                                                                    4                             3                                                            2                                                                             1

           47

                                                                                                                                       Boundary
                                                                                                                                                                                                           p
                                                                                                                                                                     3100mm
                                                                                                                                        2493 mm




                                                                                                                                                                                                                                ramp                                     p
                                                                                                                                                                                                         stair                  ramp


                                                                                                                                                                                                                 existing public footpath    15.0m
                                                                                                                                                                                                 4800mm

      new trees


      reinstated planting and terrain area within boundary,                                                Basement car park numbers - 43                                                                                New ramp and stair to comply with AS1428.1 2021 - remove existing
      provide new planting - medium shrubs, ground cover.                                                  Total car park numbers after proposed adjustments to be            Bottelbrush Avenue                         trees and vegetation, remove existing concrete ramp and handrail.
      reinstated planting and terrain area within road reserve,                                            61 including 1 loading Bay. This conforms to condition 15                                                     Provide new complying concrete stair and ramp with non slip tile and
      provide new planting.                                                                                of Development approval DNA 184 - 10 September 1990                                                           Aluminium balustrades.                                                                                   0        2000mm 5000mm                         10000mm
      new planting and terrain to replace existing infrastructure


                          FLEXURE Pty Ltd                                                                                                                                                                                                                 USE FIGURED DIMENSIONS.         ISSUE AMMENDMENT                        Title
                                                                                                                                 CLIENT
                                                                                                                                                  THE BODY CORPORATE OF NOOSA CENTRAL                                                                     DO NOT SCALE FROM THE           date     details
                                                                                                                                                                                                                                                                                                                                                 PLAN G NEW
                                                                                                                                                                                                                                                          DRAWINGS. CONFIRM ALL       29.11.24   additional information - blue    Date
                          GRANT CALDER ARCHITECTURE AND URBAN DESIGN                                                                                                                                                                                      DIMENSIONS ON SITE PRIOR    clouded                                                    11 October 2024
                                                                                                                                                                                                                                                                                      16.04.25   roof & planted areas
                                                                                                                                                                                                                                                          TO CONSTRUCTION OR
                                                                                                                                                                                                                                                          FABRICATION. IT REMAINS                                                 Scale
                                                                                                                                 PROJECT          NOOSA CENTRAL STAGE 2, 6 Bottlebrush Avenuen Noosa Junction                                             THE CONTRACTORS
                                                                                                                                                                                                                                                          RESPONSIBILITY TO ENSURE                                                Drawn          Grant Calder
                          21 Bursaria Street Peregian Beach
                          ph: 0488 084 184                                                                                                        - ALTERATIONS AND IMPROVEMENTS - SCHEMATIC DESIGN                                                       COMPLIANCE WITH ALL
                                                                                                                                                                                                                                                          RELEVANT CODES AND
                          email - [email protected]                                                                                                                                                                                                    REGULATIONS IS                                                          Checked        Grant Calder
                          Registered Architect- BOAQ 3112                                                                                                                                                                                                 MAINTAINED AT ALL TIMES.
                                                                                                                                                                                                                                                                                                                                  Drawing No     GC 138 SD 05                      Issue - 3
Log in to download the original file

FURTHER ADVICE - Attachment 1 - Minor Change Plans.pdf · 3.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.