PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 8 DECEMBER 2015
Driveways
18. Access driveways to the proposed lots must be provided generally in accordance with
the approved plans and in compliance with an Operational Works approval and must
include in particular:
a. Crossovers (separate or shared) in accordance with the applicable standard
drawings; and
b. Sealed driveway access handles in accordance with Council’s standards and
policies.
Electricity and Telecommunication Services
19. Underground reticulated electricity and telecommunication services must be provided
to each lot in accordance with an approval for Operational Works and the standards
and requirements of the relevant service provider.
20. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
21. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Easements
22. Easements for inter-allotment drainage within all affected lots that encompass the
constructed drainage structures and must provide for secondary flow path where
necessary.
23. Unless otherwise agreed in writing by the relevant service provider, any municipal,
public or third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
24. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
25. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Tunnel Boring for Services
26. All earthworks must be undertaken in accordance with an Operational Works approval,
and contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council.
27. Any underground pipelines and/or conduits for services across George Street must be
tunnel bored under road and pathway pavements, or as may be approved otherwise
by Council in the Operational Works stage. Also, tunnel boring shall be used where
necessary to preserve mature tree identified for protection and as may be
recommended by an arborist or a similar specialist in charge.
Page 8 of 68
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.