Skip to the record
Every meeting, every word.

Original source · versioned page text

Annexure A to Order 22Aug2022 - Conditions and Plans

of 99

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (31.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 5, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
A03        Level 1 Floor Plan, prepared by Lisa Page             22 January 2021

A04        Level 2 Floor Plan, prepared by Lisa Page             22 January 2021

A05        Level 3/Terrace, prepared by Lisa Page                22 January 2021

A06        Elevations Views: North & South facing, prepared      22 January 2021
           by Lisa Page (as annotated by Council)

A07        Elevations Views: East & West facing, prepared by     22 January 2021
           Lisa Page (as annotated by Council)

A08        Perspective view, Terrace level, prepared by Lisa     22 January 2021
           Page

A09        Perspective views: south, west, north facing,         22 January 2021
           prepared by Lisa Page

A10        Perspective views: south/east/north         views,    22 January 2021
           prepared by Lisa Page

A11        Section view-east facing, prepared by Lisa Page       22 January 2021

A12        External Material Finishes Palette                    22 January 2021
           by Lisa Page

-          Landscape Concept Design document including                      -
           site plan and perspective, cross sections, look and
           feel and design, prepared by Louise Custance

            Approved Plans – July 2022 Units 9-10 (Lot 30 SP307674)
Plan No.   Plan No.                                              Plan No.
SK 002     Proposed Holyman Unit 3D perspectives, prepared       N/D
Iss SK2    by Gerard Smith Design



SK 101     Site Plan, prepared by Gerard Smith Design            May 2022
Iss SK2

SK 102     Setback Plan & Vehicle Manoeuvring Plan,              May 2022
Iss SK2    prepared by Gerard Smith Design


SK 201     Floor Plan – All Levels, prepared by Gerard Smith     May 2022
Iss SK2    Design


SK 401     Elevations – Sheet 1, prepared by Gerard Smith        May 2022
Iss SK2    Design


SK 501     Cross Sections – Sheet 1, prepared by Gerard          May 2022
Iss SK2    Smith Design


SK 951     Overviewing Diagrams – Level 1, prepared by           May 2022
Iss SK2    Gerard Smith Design




                                                                                Page 5 of 13
                                                                                               5
Log in to download the original file

Annexure A to Order 22Aug2022 - Conditions and Plans.pdf · 31.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.