Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Annexure A to Order 22Aug2022 - Conditions and Plans

of 99

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (31.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
         SK 952       Overviewing Diagrams – Level 2, prepared by      May 2022
         Iss SK2      Gerard Smith Design

3   Development authorised by this approval must be undertaken generally in accordance
    with the Approved Plans listed within this Decision Notice.
    Construction Management Plan & Pre-Start Meeting
4   A Construction Management Plan must be submitted to and approved by Council prior
    to obtaining a building approval and must specifically address the following:
    a.      Traffic Management during all aspects of the construct phase including.
            i.     Traffic Management Control Plan in accordance with Manual of Uniform
                   Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                   control measures prior to construction.
            ii.    Maintenance of safe and unobstructed access across the frontage of the site
                   for pedestrians and vehicles both during daily construction and after daily
                   construction has ceased.
           iii.    Parking arrangements, number, and locations for vehicles associated with
                   the proposed construction works that need to be onsite or in proximity to the
                   site at any time during the phases of the construction works. Where relevant,
                   time slots and off-peak hours should be indicated. All efforts must be made
                   to prevent or minimise adverse impact on public parking availability in the
                   local area.
    b.      Works programme identifying key components of the works and their respective
            durations.
    c.      Written confirmation from the Body Cooperate accepting the use of the common
            property for activities associated with the construction works as identified in the
            final Construction Management Plan and the Traffic Management Plan.
    d.      Proposed fencing to the site during the construction phase of the development.
    e.      Protection fencing for existing landscaping and trees in proximity to the work
            activities.
    f.      Maintenance and protection of water quality and existing drainage lines through
            the construction site through the implementation of appropriate erosion and
            sediment control measures to prevent silt and contaminants from entering existing
            stormwater system.
    g.      Establishment of a communication protocol with the general public, adjoining
            owners, emergency services and local businesses to advise of agreed
            construction times, impacts on traffic and services and other relevant issues.
    h.      identification of complaint management procedures including:
            i.     Contact details for the on-site manager.
            ii.    Dispute resolution procedures.
5   Council must be contacted at least 5 working days prior to any works commencing to
    organise a pre-start meeting. The contact number to arrange a pre-start meeting is Diogo
    Carrico on ph.53296465. The pre-start meeting must include:
    i.      The relevant parties for any Civil Engineering and Building works.
    j.      A representative of the Body Corporate.




                                                                                      Page 6 of 13
                                                                                                     6
Log in to download the original file

Annexure A to Order 22Aug2022 - Conditions and Plans.pdf · 31.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.