Original PDF page 6, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn SK 952 Overviewing Diagrams – Level 2, prepared by May 2022
Iss SK2 Gerard Smith Design
3 Development authorised by this approval must be undertaken generally in accordance
with the Approved Plans listed within this Decision Notice.
Construction Management Plan & Pre-Start Meeting
4 A Construction Management Plan must be submitted to and approved by Council prior
to obtaining a building approval and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including.
i. Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction.
ii. Maintenance of safe and unobstructed access across the frontage of the site
for pedestrians and vehicles both during daily construction and after daily
construction has ceased.
iii. Parking arrangements, number, and locations for vehicles associated with
the proposed construction works that need to be onsite or in proximity to the
site at any time during the phases of the construction works. Where relevant,
time slots and off-peak hours should be indicated. All efforts must be made
to prevent or minimise adverse impact on public parking availability in the
local area.
b. Works programme identifying key components of the works and their respective
durations.
c. Written confirmation from the Body Cooperate accepting the use of the common
property for activities associated with the construction works as identified in the
final Construction Management Plan and the Traffic Management Plan.
d. Proposed fencing to the site during the construction phase of the development.
e. Protection fencing for existing landscaping and trees in proximity to the work
activities.
f. Maintenance and protection of water quality and existing drainage lines through
the construction site through the implementation of appropriate erosion and
sediment control measures to prevent silt and contaminants from entering existing
stormwater system.
g. Establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic and services and other relevant issues.
h. identification of complaint management procedures including:
i. Contact details for the on-site manager.
ii. Dispute resolution procedures.
5 Council must be contacted at least 5 working days prior to any works commencing to
organise a pre-start meeting. The contact number to arrange a pre-start meeting is Diogo
Carrico on ph.53296465. The pre-start meeting must include:
i. The relevant parties for any Civil Engineering and Building works.
j. A representative of the Body Corporate.
Page 6 of 13
6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.