Annexure A to Order 22Aug2022 - Conditions and Plans
The original of this document is very large (31.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn • 10pm to 7am: No audible noise.
15 The certification must be submitted to Council at the completion of the building works,
which certifies that operational noise from any fixed plant and equipment complies with
the requirements of this Decision Notice.
Landscaping Works
16 The Cocos palm on Lot 17 must be removed prior to construction works commencing
on site.
17 The Hills Fig tree on Lot 17 may be removed as part of preparing the site for construction.
18. The development site must be landscaped generally in accordance with Planning
Scheme Policy PSP03 – Landscaping Plants and guidelines and the following
requirements:
o. Lot 17 - 2 x 45L Small Leaf Lilly Pilly’s (Syzygium luehmannii) planted in the
general location of the vegetation approved for removal.
p. Lot 17-3 x 45L trees listed in the PSP03 suitable for the Noosa Heads locality must
be planted between the building and the northern boundary and north western
corner of Lot 17 that grow to a maximum height of 7 metres.
q. Lot 19 - the works as generally shown on the approved Landscape concept plan
as prepared by Louise Custance except for the usage of exotic species and
include 2 advanced local native tree species in a pot size of no less than 45L that
grow to a maximum height of 7 metres.
r. Lot 19 – Landscaping must be provided between the building and western
boundary that grow (on average) to a maximum height of 5 metres in order to
soften the built form where viewed from the west.
19. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
20. Landscape works must be completed prior to the commencement of the approval use.
21. Vegetation to be retained must be protected from clearing or construction activities by:
s. clearly marking vegetation to be retained with flagging tape
t. installing protective fencing around the drip line of the vegetation
u. restricting stockpiling, storage and vehicle parking to those areas which are
already cleared
v. using low impact construction techniques around vegetation.
Damage to Services and Assets
22. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
w. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
x. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Page 8 of 13
8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.