Response to Information Request 10-6-2025 Traffic guidance scheme · OPW25/0042
www.invarion.com
TRAFFIC MANAGEMENT DESIGNER
TRAFFIC GUIDANCE SCHEME - COVER PAGE
David Stevens
QLD: TMD OP293 4/20
25
NSW: PWZ - TCT1043731
28/0
(Serenity Close, Noosa Heads)
Date: 28/04/2025
TGS TITLE: Serenity Close, Noosa Heads
TGS #: CMI-1AP-25040286
116 Ipswich Road, Woolloongabba QLD 4102
Telephone: 1300 282 328
Email: [email protected]
TMR REGISTRATION NUMBER: 0403
PAGE # DESCRIPTION
CMI-1AP-25040286.1 CMI-1AP-25040286.2
1 Cover Page
2 Tables
3 Notes and Requirements
4 Through / Past and Around Analysis
5 Risk Assessment
15 TTM Diagram
Client: CMI Investments
Client reference number/PO: TBA
Site Contact: Daniel Cooper
WORK Phone Number: 0419 762 525
AREA
TMC Contact: Kirra Pracy
TMC Phone Number: 0488 014 432
Proposed start of works: 19/05/2025
Completion Date: TBA
Hours of Works: 07:00 to 16:00
Induction Site: Toolbox prior to works
-----------------------------------------------------------------------
Scope of works / client brief
- Trucks turning to conduct works
- Hold and release
- Tree Clearing and Bulk Excavation
TGS REQUIREMENTS (CMI-1AP-25040286):
Signs:
Controllers:
22
2
TMA:
VMS Utes:
0
0
Operation:
Road Type:
Trucks Turning/hold and release
Two-way Divided
Lane Width:
Posted Speed:
3.0m
50 km/h
CMI Investments
Traffic Lights: 0 Additional: N/A Travel Path: Past Direction: NB/SB/EB/WB
TC Utes: 2 Road Authority: NSC Road Category: 1 RPEQ Sign Off: NO
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of pages 2 to 7 (of 16)
Page 2
www.invarion.com
Figure 2.2: Speed to be used for advance warning sign spacing Table 3.2: Placement of termination signs
Table 5.7: Recommended taper length
Speed (km/h) Distance (m) Recommended taper length (m)
Speed (km/h)
110 80 60 40 < 55 15 < 45
Traffic control taper
15
Lateral shift taper
5
Merge taper
15
56 - 65 45 46 - 55 15 15 30
> 66 Equal to the speed (km/h) 56 - 65 30 30 60
66 - 75* N/A 70 115
Table 4.3: Estimated queue length 76 - 85* N/A 80 130
86 - 95* N/A 90 145
Multiplier
Maximum stopping time 96 - 105* N/A 100 160
(minutes)
Ma (multiplier for average vehicles)
Mo (Multiplier for oversized ≥>106*
106* N/A 110 180
vehicles)
2 2.4 8 * Taper lengths are based on a:
5 6 20 3.5 m width of the lane to be closed
lateral shift taper length equal to 1.0 m/s lateral shift
200 m 200 m 200 m 10 12 40 merge taper length equal to 0.6 m/s lateral shift
Table 2.2: Sign Spacing 15 18 60 median speed for each range. For example, speed range 76 - 85 has a median speed of 80 km/h
30* 36 120
Speed (km/h)* Distance (m) Table 5.8: Distance between tapers
< 55 15 * A 30 minute stop time is unusual but has been included for some circumstances.
Speed (km/h) Distance (m)
46 - 55 45
Table 4.1: Edge clearance ≤ 45 10
> 66 Equal to the speed (km/h)
46 - 55 25
Speed (km/h) Distance (m)
56 - 65 70
Table 2.3: Recommended sight distance to a traffic control device For post-mounted reflectors, temporary hazard markers > 65 1.5 times the speed (km/h)
Speed (km/h) Distance (m) All speeds 1
< 45 For traffic cones, bollards, longitudinal channelising barricades or any other delineation device Table 6.1: Delineation adjacent to excavations
50
< 65 0.3*
46 - 55 70 Protection required
> 66 0.5
56 - 65 90 Speed (km/h) Traffic volume Clearance to
Depth of excavation (mm)
(vpd)* excavation (m)
> 66 Two times the speed (km/h) Table 4.2: Spacing of traffic cones, bollards and post-mounted delineators
50 to 250 251 to 500 >500
Figure 2.3 is an example of sign placement when considering sign visibility and recommended sight Recommended maximum
Purpose and usage Speed (km/h) < 2.5 Option 1 Option 2 Option 3
distance. The arrow represents the sight distance required for a road user to perceive and react to the spacing (m)
message bring communicated by the sign ahead for a speed of 60 km/h. In this case, parking has been < 65 Any 2.5 - 5 Option 1 Option 1 Option 2
For traffic cones and bollards**
restricted for a portion of the roadside to ensure that sight distance to the sign is maintained
All purposes < 55 4 >5 Option 1 Option 1 Option 1
Figure 2.3: Appropriate sight distance 56 - 65 12 <5 Option 1 Option 2 Option 3
< 1500
Appropriate sight distance = 90 m = 60km > 76 18 >5 Option 1 Option 1 Option 1
> 70
Protecting freshly painted lines 56 - 75 24 <6 Option 1 Option 2 Option 3
> 76 > 1500
60 >6 Option 1 Option 1 Option 1
Footpath S S For post-mounted delineators
* For multilane roads use volume in one direction. For two-lane, two-way roads use the sum of both directions. Any
All purposes < 75 24
Shoulder variations to the recommendations in this table need to be supported by a risk assessment.
> 76
40
60
** For Options 1 and 2, cones or bollards are to be place at the top of the excavation.
*Use the speed limit where the cones and bollards are installed.
**Consider whether cyclists are using the road shoulder or bike lane and whether an appropriate alternative facility be
provided before installing traffic cones or bollards in the area. Where possible, place bollards to maintain a safe cycling Table 5.1: Road Safety Barrier System Clearance
facility.
Speed (km/h) Distance (m)*
Note: This is an example for a 60 km/h scenario. Table 5.4: Maximum length of operation under shuttle flow < 40 0.3
41 - 60 0.5
Table 2.5: Minimum lane width Traffic volume in both directions (vph) Distance (m)
61 - 80 0.5
Residential street 60
Cirteria Lane width (m)* > 80 1
701 - 800 70
General La ne widths 601 - 700 100 * Clearance is measured in front of the barrier system and not behind the barrier system in the deflection zone.
≤60 km/h Minimum 3.0* 501 - 600 150
70, 80 or 90 km/h Minimum 3.2* 401 - 500 250 Tolerances Table (m)
≥100 km/h Minimum 3.4* 351 - 400 400 -10% +25%
Distance -10% +25% Distance -10% +25% Distance
Curve with radius 100 – 250 m Add curve widening of 0.5 m per lane 301 - 350 600
< 300 800 10 9 13 70 63 87 130 117 163
In addition to the curve widening of 0.5 m per lane,
Curve with radius < 100 m consider the swept path of long vehicles (for example, 15 80 100
buses, trams)
13 19 72 140 126 175
Table 5.5: Length of temporary speed zone
Two-way residential street Minimum of 5.5 (sum both ways) 25 22 31 90 81 113 150 135 187
Temporary
Shuttle flo w operation speed limit Length of zone (m) Conditions 90
(km/h)
30 27 38 100 125 160 144 200
Shuttle flow with active control (by traffic controllers or
Minimum 3.0*
PTCDs) high level of hazard for workers on foot. 45 40 56 105 95 130 180 162 225
< 40 100 - 200 it is impractical to separate pedestrians or cyclist from vehicular traffic
Shuttle flow, without active control on residential
Minimum 3.0* and Maximum 3.5 to ensure vehicles 50 45 99 180 250
streets, includes no control or the use of GIVE WAY
take turns using a single lane
in the work area 62 110 137 200
and ONE WAY signs (see Section 5.4.4). 100 (minimum) - workers on foot within 1.2 m of traffic with no physical barrier
40
*Temporary minimum lane widths are not to be greater than existing lane widths. This minimum temporary lane width
500 (maximum) structural danger to bridges
60 54 75 120 108 150 300 270 375
does not apply to curves of radius 250 m or less, or locations where there are fixed vertical obstructions such as fences workers on foot or small plant within 3 m of traffic with no physical
or safety barriers within 30 cm of the edge of the lane on one or both sides. Where these conditions apply, consider barrier (i.e road safety barrier)
Approved head /
widths wider than those listed previously to accommodate large vehicles. The speed to be used when considering lane on approach to the traffic controller of PTCD
High Vis Clothing Use gloves when
width requirements is the speed limit (permanent or reduced) which is applicable to that length of road. reduced visibility (e.g. dust or smoke) sun protection
Consideration shall also be given to cyclists and pedestrians (see Sections 3.10, 4.10 and 5.13 for further details on 60 150 (minimum) to be worn manual handling
reduced standard alignment required
traffic management regarding pedestrians and cyclists).
Where there is a change in speed limit, the minimum lane width requirements may also change with lane widths based degraded pavement surface
on the applicable speed limit at that location. Changes to lane widths will apply at the change in speed limit, with the Safety glasses No jewelry
newly laid bituminous seal. Lase up safety
transition to the new lane width commencing at the speed limit change location. The transition to the new lane width to be worn as permitted on
shall occur at a rate which matches the transition rate for a lateral shift (see Table 5.7) of the same distance (the lane
80
workers on foot or small plant within 3 -6 m of traffic with no physical barrier
per site boots to be worn
width change) in the same location (note the 200 m value applies to taper lengths): for example, for a 500 (maximum) electrical sites
disturbance to alignment or pavement surface
lane width reduction of 0.4 m, as the lateral shift values are based on a full 3.5 m shift, the equivalent recommended requirements
lateral shift distance would be divided by approximately 8.7 (3.5 / 0.4) to establish the taper length required for the for advance warning of a 40 or 60 km/h when speed is 100 km/h or
80 (buffer) 300 (maximum)
0.4 m transition in lane widths. more. Template Version 14 04/09/2024 to Be Reviewed By 04/09/2025
Page 3
www.invarion.com
General Notes for TGS Cyclist Notes
Sign Placement and Orientation
NOTES: 1. Cyclists Shall be notified of all traffic maneuvers required of them prior to the works.
- Where practicable, signs shall be duplicated on the right-hand side of the road.
- Speed reduced to 40kph as workers / Plant items will be within 1.2m of moving traffic. 2. Where a Cycle path/lane is removed :
Multi Message Sign Frame - MMS
- The Workers (symbolic) sign shall be removed when workers have left the area or are no longer - Any diversion for cyclists SHALL maintain the same quality and lighting as the closed path
visible to traffic. - Signage Shall be installed to assure Cyclists of correct travel paths
- Four cones, spaced 4 m apart, should be installed on the centerline starting 10m in advance of the
700mm Traffic Cones
- Traffic shall be reduced to 40 where Cyclists are required to traverse temporary paths between work areas
Traffic Controller position during
- A Traffic Controller Ahead / PREPARE TO STOP sign may be required on the right-hand side of How to Apply the Traffic Guidance System Bollard
high volume roads single-lane reversible flow operation.
- The minimum lane width including trafficable shoulder shall be 3.0m This section provides brief guidance on the installation, monitoring, maintenance and removal of
- The safety buffer shall be a minimum of 20 to 30m. The safety buffer may be increased to a traffic management treatments. Temporary Barrier System
maximum of 100 m providing it does not adversely affect the placement and distances of signage /
devices outlined in the Traffic Guidance Scheme. Pre-installation
- Vehicular access to the work area can be permitted through the safety buffer. The safety buffer PWD Approved Pedestrian Ramp
shall be kept clear of work vehicles, plant, stockpiled material or other activity including specialist Undertake the following checks prior to works being conducted on site:
vehicles. • confirm the TGS has been signed off by the relevant personnel
- Traffic controller to assist pedestrians as required • confirm that OHS paperwork (e.g. job safety awareness forms) have been completed and signed off Bus Stop - Location
- All private / commercial property access to be maintained during works as practical by the construction supervisor or relevant person
- Site Vehicles should be parked: • confirm that appropriate PPE is used
a). So it does not unduly obstruct motorists’ vision of the travelled path; 80 Permanent Posted Speed Location
• confirm that a copy of the authorised TMP and TGS is onsite at all times during the works
b). To leave a clear escape path for workers; and • confirm that all devices and equipment listed on the TGS have been checked for faults and
c). Where necessary, in advance of the work area to protect workers. accounted for prior to leaving for site. Check that devices: (THM) Temporary Hazard Marker - Location
- Additional Traffic controllers shall be considered and allocated to assist pedestrians when – have no bends, breaks or surface damage
required. The use of Additional controllers is subject to an on site risk assessment conducted by – are clean
either the Lead Controller and/or site supervisor prior to the commencement of work. – not colour faded to a point where they have lost their impact Barrier Board
– have effective reflective surfaces. Slow
RayBan
RayBan
Traffic Controller
TRAFFIC CONTROL
Installation
TRAFFIC CONTROL
When designing a TGS, the designer shall consider and document the process for
installing traffic control devices: Traffic Lights - Portable Traffic Systems
• Ensure they do not conflict with information on any existing signs or warning signs already erected.
Cover or remove any existing signs that are not relevant during works (see Section 2.5.3).
• Ensure they do not create an unavoidable hazard for road users or road workers. Traffic Control Ute
• Ensure they are efficient, logical and quickly isolate the work area from road users.
• Signs shall be installed in the appropriate order as detailed in AGTTM Part 6. Cone Truck
• Position signs as per the requirements in the TGS and AGTTM Part 6.
Site Inspections • Ensure traffic control devices will be clearly visible to approaching road users (see Section 2.5.3).
• Ensure traffic control devices are effectively stable (see Section 2.5.3). Truck Mounted Attenuator - TMA
Inspections should be undertaken; • Ensure suitably trained workers can install and remove traffic control devices on roads, with
appropriate protection, which may include a TMA.
VMS
• at least daily, or more frequently depending on location and likelihood of traffic management being • Install from the non-traffic side of a vehicle, the rear of the vehicle if a shadow vehicle is provided or VMS Truck / Ute
Legend
disturbed 10m in front of the vehicle.
• before work starts each day • Ensure vehicles used to install traffic control devices and equipment have a flashing lamp and
• immediately following the installation of a TGS arrow board clearly visible to approaching road users. Work Area
• before the start of work activities on site
• during the hours of work
• closing down at the end of the shift period
Abbreviations Commonly used Safety Buffer- Full Exclusion Zone
on these documents
• periodic inspections after work hours and at night, and at unattended sites Fatigue Management
• after any change in the traffic management arrangement on site T MC Traffic Management Company
• following any environmental or weather events. T GS Traffic Guidance Scheme TMA Roll Forward Area
T MP Traffic Management Plan It is a requirement that traffic controllers performing
stop slow duties or are required to be in a single
SOW Scope Of Works Detour Paths
location be relieved of duty or have their duty
T C Traffic Controller
changed for a period of 15 minutes every 2 hours.
T MI Traffic Management Implementation
Pedestrian Notes RayBan
Pedestrian Path
T MD Traffic Management Designer TRAFFIC CONTROL Recommended additional staff
1. Pedestrians Shall be maintained by way of dedicated path or escort on all works. T MA Truck Mounted Attenuator required based on active traffic
VMS Variable Message Sign controllers onsite.
2. Plastic mesh fencing comprising of flexible orange mesh approximately 1 m high, shall be PT SS Portable Traffic Stopping System Containment Fence for Pedestrian
installed in areas where pedestrian traffic requires separation from the work area to prevent PT CD Portable Traffic Control Devises
unintended access to works POLICE
LOS Level of Services
RayBan
Slow
2 - 4 : Require 1 Additional TC Police - Point Duty
ENS L
AN
Q UE
D
PO
WI TH LI C E
HO RVE
N O U R W E SE
RayBan
POLICE
ROW Right Of Way
- ATF fencing shall be installed in areas where pedestrian traffic requires separation from the work 5 - 8 : Require 2 Additional TC's
TRAFFIC CONTROL
TT M Temporary Traffic Management
area preventing unintended access to the works under Contract. 9 - 12 : Require 3 Additional TC's
- Pedestrian Signs shall be provided in advance of the work area and/or hazard and placed adjacent T MC Traffic Managment Company
Police Vehicle
POLICE
to the pathway. QPS Queensland Police Service
Signs used for pedestrian management shall be erected so that: QAS Queensland Ambulance Service
(a) They are properly displayed and securely mounted ES Emergency Services
MOWER/ TRACTOR
(b) They do not become a possible hazard to worker, pedestrians or vehicles
T MR Dept Transport & Main Roads QLD
(c) They cannot be obscured from the line of sight or view of the pedestrian
(d) They do not obscure other devices from the line of sight or view of the pedestrian MUT CD Manual of Uniformed Traffic VAC TRUCK
Control Devices
- The unobstructed width of the footpath shall be no less than 1m at local restriction
Queensland Guide to Temporary
- The surface of the footpath shall provide for prams, strollers and wheelchairs, and other mobility QGTT M
Traffic Management
aids. Work Truck
Australian Guide to Temporary
AGTT M
- Affected pathways shall be clearly delineated signed and fenced prior to commencement of work. Traffic Management
- Lighting to AS/NZS 1158.4 shall be provided if the associated work reduces the sight distance
and/or the pedestrians ability to negotiate the travel path in hours of darkness.
OHS Occupational Health Safety FRANNA CRANE
- Additional Traffic controllers shall be considered and allocated to assist pedestrians when required. AS/NZS
Australian Standards / 116 Ipswich Road, Woolloongabba QLD 4102
New Zealand Standards
The use of Additional controllers is subject to an on site risk assessment conducted by either the Telephone: 1300 282 328 EWP
Lead Controller and/or site supervisor prior to the commencement of work. MM Millimeters Email: [email protected]
- Traffic shall be reduced to 40 where pedestrians are required to traverse temporary paths between
work areas and traffic - Less than 1.2m separation from traffic. M Metres Light Tower
TMR REGISTRATION NUMBER: 0403
KM/H Kilometres per Hour
Page 4
www.invarion.com
MOTORISTS PEDESTRIANS
OPTIONS FEATURES COMMENTS RESULT OPTIONS FEATURES COMMENTS
- Acceptable LOS to be maintained - Pedestrians separated Works occupy full footpath area
Works will interfere with the travel DETOUR Works do
Suitable notavailable
path impede Footpaths
to create /
- Minimal traffic disruption from Site personnel, plant
Works will
Works will interfere
interfere with
with the
the travel
travel path Pathways and Pedestrian Crossing
path of Road users, however works items and general site hazards detour
TRAFFIC THROUGH THE WORKSITE - Minimal delays to the public path
of of users
road Road users, however
and cannot be works
can be undertaken via speed
- Existing travel path to be maintained can be undertaken
undertaken via holdvia hold & release
& release
reduction
Work area allows for delineation
- Pedestrians separated Works do not impede
CLOSE
SIDE-TRACK from Site personnel, plant
and temporary path toFootpaths
be /
FOOTPATH Pathways and Pedestrian Crossing
established
items and general site hazards
- Acceptable LOS to be maintained Works will
Works will be
notcontained
be contained to road
to the the
SHOULDER - Minimal traffic disruption shoulder
shoulder - There are No existing Pedestrian
- Pedestrians separated Works do not interfere with pedestrian
CLOSURE - Minimal delays to the public Works do
Works willnot
interfere with
interfere theTraffic
with Traffic Ramps and Footpaths in the
from Site personnel, plant access to pathway works to be
- Existing travel path to be maintained Lanes
Lanes RETAIN OPEN FOOTPATH immediate Works. T/C to assist
items and general site hazards separated by delineation
otherwise.
CYCLIST
OPTIONS FEATURES COMMENTS
- Acceptable LOS to be maintained Lane closure is not suitable due to
- Work areas accessible to personnel, Works will be contained with in the
road configuration - Cyclist separated Works occupy full Cycle Lanes or
LANE CLOSURE plant items and site vehicles lane there is sufficient room to allow WorksPaths.
Cycle do notSuitable
impedepath
Cycle Lanes
TRAFFIC PAST DETOUR from Site personnel, plant
- Site personnel / plant items separated traffic pastrequires
Work area work site.
larger portion of the items and general site hazards or Cycle Paths
available to create detour
THE WORKSITE
from vehicular traffic roadway
CLOSE
CYCLE LANE Work area allows for delineation
- Cyclist separated Works do not impede Cycle Lanes
SIDE-TRACK from Site personnel, plant
and temporary path Cyclist to be
or Cycleinto
shifted Paths
Traffic Lane
items and general site hazards
- Cyclist separated -Works
There do
arenot
No interfere with Cycle
existing Cycle Lanes
Lane closure is not required as the Lateral shift is not required as the road from Site personnel, plant Lanes
or orPaths
Cycle CycleinPaths works to be
the immediate
RETAIN OPEN CYCLE LANE
road configuration allows for-more
Acceptable LOS to be maintained
Work not leave
area will allows
configuration allow for enough
sufficient lanefor
more room items and general site hazards separated by delineation
Works.
LATERAL
appropriate SHIFT
options - Minimal traffic disruption
width
traffic for
appropriate Lateral
to pass Shift
options
safely
- Minimal delays to the public
LOCAL ACCESS
RESIDENTIAL AND BUSINESS ACCESS
OPTIONS FEATURES COMMENTS
- Work areas are accessible to work
personnel, plant items and site vehicles
- Access , cannot be maintained
- Traffic will be separated from work CLOSE residences and business will Residences
Works andwith
interfere business
personnel / plant items and site vehicles. ACCESS need to be notified 72hrs are not affected
Access during
- Notification of this
There is not enough trafficable lane
- Will make for more efficient and timely No
Roadsuitable detour
Closure with available
detour not required prior to closure and armaments operating times.
Stakeholders required
width for traffic to pass through the
DETOUR works by allowing site vehicles, plant inconvenience to road users
the road configuration allowsconsider
for more made
work area, a detour will be necessary
items and delivery vehicles to park to high.
appropriate options
for this project.
and unload on roadway. CLOSE -General Access is closed Local access to residences,
LOCAL - Local access to be maintained Access points to be delineated or
- Lowers the chance of collision ACCESS commercial and or private property
ACCESS identified
between site personnel/ plant items/ - Traffic Controllers to assist are to remain accessible during
MAINTAINED TC to assist with access
site vehicles and the general public residents and business'. General Works or Events.
- Local access to residence
- Work areas are accessible to work and commercial business will Alternate arrangements for access
Residences of business access will
personnel, plant items and site vehicles RETAIN ACCESS be unaffected to be arranged prior to
be maintained at all times.
- Traffic will be separated from work implementation of TGS
SIDE-TRACK personnel / plant items and site vehicles.
TRAFFIC AROUND - Will make for more efficient and timely Road Closure with Side-track is not
THE WORKSITE Way configuration
Road way has suitable corridor widthfor
not suitable BUS STOPS
works by allowing site vehicles, plant required the road configuration allows
and areas for a Side-Track
side-Track
items and delivery vehicles to park for more appropriate options
and unload on roadway. OPTIONS FEATURES COMMENTS
- Lowers the chance of collision
between site personnel/ plant items/
site vehicles and the general public - Buses will be kept clear of - No bus stops are affected within the
work area. Bus Stop Closure - Translink to be
TEMPORARY work area during operating times as
- General public will be clear notified with alternate arrangements for
- Work areas are accessible to work STOP it is not recommended to relocate
of site hazards. patrons Temporary Stop located in close
personnel, plant items and site vehicles PROVIDED bus stop unless requested by
- Work site will not have to proximity to work zone
CROSSOVER - Traffic will be separated from work facilitate bus access. client.
(CONTRA-FLOW) personnel / plant items and site vehicles.
Road Configuration will not allow a CLOSE
- Will make for more efficient and timely Road Closure
Suitable areas withtraffic
Contra-flow is not
crossover therefor to crossover
are no suitable areas BUS STOP
works by allowing site vehicles, plant required the
adequate LOS road
for configuration
prewarning allows
signage - Buses will be kept clear of
to divert traffic to opposing side of the
items and delivery vehicles to park for more
and appropriate
required options
delineation areas. work area.
road No bus stops are affected within the
and unload on roadway. - General public will be clear of
EXISTING STOPS workStop
Bus areaClosure
during operating times
- Translink to beas
- Lowers the chance of collision site hazards.
USED AS AN it is not recommended
notified to relocate
with alternate arrangements for
between site personnel/ plant items/ - Work site will not have to
ALTERNATIVE bus stop unless requested by
patrons
site vehicles and the general public facilitate bus access.
- Existing bus stops will client.
facilitate extra traffic.
- Commuters will not be
Works meet requirements for Short required to travel to alternate No bus stops are affected within the
SHORT TERM, LOW IMPACT WORKS - Acceptable LOS to be maintained - Short-term Low impact treatments are stop.
Term Low Impact Works with Existing
workStop
Bus bus
area stops
during
Closure - shall
operatingremain
Translinktimesopen
to beas to
- Minimal traffic disruption not possible due to the high impact - Buses will retain original route
completion of Risk Assessment RETAIN CURRENT BUS STOP load andrecommended
it is not
notified unload
with passengers
alternative during
toarrangementss
relocate
- Minimal delays to the public nature and duration of the work. - Locating a suitable site for
completed operating
buspatrons
for times. requested by
stop unless
temporary stops will not be
required client.
- Minimal delays
Page 5
www.invarion.com
Client: CMI Investments Location: Serenity Close, Noosa Heads
Road Type Two-way Divided Plan Number: CMI-1AP-25040286 Speed Zone 50 km/h
RISK ASSESSMENT
RISK RATING
Elimination
Work not to commence - review
16-25 Extreme
control measures immediately.
Safety/Environmental Safety/Environmental
Safety Consequence of Risk:
Substitution Likelihood of Risk: Hierarchy of Control:
Senior supervisory management to
S5 - Catastrophic 1. Elimination ensure all controls are in place work
S4 - Major
Engineering 5 - Almost Certain S3 - Moderate
commences. Strict monitoring of
2. Substitution 10-15 High control measures. Work shall be
Controls S2 - Minor conducted with supervision and or
4 - Likely S1 - Insignificant 3. Separate co-worker i.e. person involved with
Administrative activity must not work alone.
Controls 3 - Moderate Environmental Consequence
4. Engineering,
of Risk:
Design/Redesign Responsibilities must be defined
2 - Unlikely E5 - Disaster and understood by those involved
PPE 5-9 Medium
E4 - Environmental Harm 5. Administration, Training before commencing work. Minimal
1 - Rare E3 - Environmental Nuisance supervision required.
E2 - Insignificant Effect 6. PPE, Environmental
E1 - Day to day Issue Controls 1-4 Low Control by routine measures.
CONSEQUENCES
LIKELIHOOD
S5- CATASTROPHIC / E5- DISASTER S4- MAJOR / E4- ENVIRONMENTAL HARM S3- MODERATE / E3- ENVIRONMENTAL NUISANCE S2- MINOR / E2- INSIGNIFICANT EFFECT S1- INSIGNIFICANT / E1-DAY TO DAY ISSUE
5 - ALMOST CERTAIN 25 20 15 10 5
4 - LIKELY 20 16 12 8 4
3 - MODERATE 15 12 9 6 3
2 - UNLIKELY 10 8 6 4 2
1 - RARE 5 4 3 2 1
Potential Risk Initial Risk Control Measures Revised Risk Actions
Source Event Risk Evaluation Likelihood Consequence Rating Options Likelihood Consequence Rating Who What
Specifications / Standards / Practices
1
Clarity of applicable 1. Copies of relevant Document onsite
specifications, Application of incorrect or expired 1. Reference Library available holding ALL 1. Client 2. Ensure that TGS is drafted to
standards, rules and specifications, standards, rules and current versions of the COP, MUTCD, required standards
policies including policies leads to confusion regarding 3. Ensure that Signs and Devices are
AGTTM, QGGTM 2. TMD
Present at this installed as per the TGS review
conflict between mandatory safety regulations leading Moderate Major High 2.Records of Client Requests Unlikely Major Medium
location relevant documentation prior to
requirements from to inconsistent application and 3.Review of all documentation Prior to 3. TMI commencing shift
RIM / PCBU etc. worksite not in line with required commencing works. 4. Ensure that they hold license's and
Documentation of safety standards 4. TC competencies that are valid and
superceded standards suitable for works undertaking
2 1. Provide accurate information
1. Remove cones from Centre of narrow
relating to Road conditions and
roads at TC station. 1. Client
If Work site conditions change and this environment
1. Monitor work site conditions
2. Amend sign placement to accommodate
Variation of Design Source / Event becomes a concern a Site 2.
2 .Consider site conditions
Contact details suppliedand road
obstacles and provide line of sight to TCD 2. TMD
MUTCD Present
Change in position of TCD due to road Not at at
present this
this Specific Risk Assessment shall be layout limitations
3. Report any changes to conditions
Moderate
Rare Minor
Minor Medium
Low 3. Repeat sign on same side of road if Unlikley Minor Low
AGTTM layout and environmental conditions location undertaken and if the situation is unable to 3.
to Adjust with in tolerances contact
PC or Supervisor
unsuitable to duplicate on other side of road 3. TMI
QGTTM be addressed Contact Supervisors and/or TMD if adjustments
4 Report any changes exceed
to the Team
4. Remove duplicate signage when unsafe
TMD for further actions tolerance
leader
to implement due to road layout or 4. TC
4. Evaluate TC station and sign
environmental reasons
positioning
3
If Work site conditions change and this 1. Client 1. Monitor work site conditions
Length Of Shuttle flow operation Source / Event becomes a concern a Site 2 .Notification
Contact details supplied allow
Design outside scope 1. Review by person competent in area 1. of requirements
exceeds guide. Not present 2. TMD 3. Report any changes to conditions
MUTCD Present at at this
this Moderate Minor
Specificthe
outside Risk Assessment
scope of MUTCDshall be
AGTTM time for design and consultation
Traffic Light operations greater than 2 location Rare Low
Medium undertaken and if the situation is unable to Unlikely Minor Low to PC ortasks
Supervisor
AGTTM location QGTTM 2.Direct to qualified persons
way operations beRPEQ
addressed Contact Supervisors and/or 3. TMI 4 Report any changes to the Team
QGTTM 2. Design and Sign off 3. Setup TGS as per instructions
Road safety Barrier Systems TMD for further actions leader
4. TC
Page 6
www.invarion.com
Potential Risk Initial Risk Control Measures Revised Risk Actions
Source Event Risk Evaluation Likelihood Consequence Rating Options Likelihood Consequence Rating Who What
Vulnerable Road Users - pedestrians, cyclists, people with disabilities and wheeled path users
4
1. Correct Staff ordered to preform
1.Work
Provide duties and regular inspection are made
If siteaconditions
path for VRUchange and this 1. Client 1. Monitor work site conditions
to ensure that is is safe
2. Use Signs and Devicesatoconcern
delineate and 2
Path route is damaged creating slip / Source / Event becomes a Site 2. .Ensure
Contact details
that TGS issupplied
drafted to
Not present direct theRisk
VRU 2. TMD 3. Report any changes to conditions
trip / fall hazards for path users or Present atat this
this Rare Minor Low
Specific Assessment shall be accommodate VRU
location Moderate Major High 3. Provide aand
undertaken Traffic controller
if the situationorisSite worker
unable to Unlikely Major Medium to PC or Supervisor
hazards when path users need to location 3. Ensure that Signs and Devices are
pass each other to assist
be regularly
addressed check
Contact for any hazards
Supervisors and/or 3. TMI 4 Reportas
installed any
perchanges
the TGS to the Team
alongfor
TMD thefurther
route actions leader
4. Ensure that they are stationed in a
4. TC position to guide or chaperone VRU
around the site safety
1. Ensure they have ordered
1. Client enough Staff to be onsite to preform
If Work
1. siteaconditions
Provide path for VRUchange and this 1. Monitor work site conditions
duties
Works activities Source
2. / Event
Use Signs andbecomes
Devices atoconcern
delineate a Site
and 2 .Ensure
2. Contactthat
details
TGSsupplied
is drafted to
VRUs Confused by TTM layouts and 2. TMD
impacting on Not present
Present at at this
this Specific
direct theRisk
VRUAssessment shall be 3. Report any changes
accommodate VRU to conditions
follow incorrect route into the work Moderate
Rare Major
Minor High
Low Unlikely Major Medium
existing or temporary location
location undertaken
3. Provide aand if the
Traffic situationorisSite
controller unable to
works to Ensure
3. PC or Supervisor
that Signs and Devices
area 3. TMI
path routes beassist
to addressed Contactthe
VRU around Supervisors
work areaand/or 4 Report
are anyas
installed changes
per theto the Team
TGS
TMD for further actions leader
4. Ensure that they are stationed in
4. TC
a position to guide or chaperone
VRU around the site safety
1. Ensure they have ordered
1. Client enough Staff to be onsite to preform
If Work
1. sitea conditions
Provide path for VRUchange and this 1. Monitor work site conditions
duties
Source
2. / Event
Use Signs andbecomes
Devices atoconcern
delineatea Site
and 2 .Ensure
2. Contactthat
details
TGSsupplied
is drafted to
VRUs Confused by TTM layouts and 2. TMD 3. Report any changes to conditions
Not present
Present at at this
this Specific
direct theRisk
VRUAssessment shall be accommodate VRU
follow incorrect route around the site location Moderate
Rare Major
Minor High
Low undertaken Unlikely Major Medium to Ensure
PC or Supervisor
location 3. Provide a and if the
Traffic situation
controller orisSite
unable to
works 3. TMI 3. that Signs and Devices
due to no clear route 4 Report anyaschanges
beassist
to addressed Contactthe
VRU around Supervisors
work areaand/or are installed per the to the Team
TGS
TMD for further actions leader
4. Ensure that they are stationed in
4. TC
a position to guide or chaperone
VRU around the site safety
5
1. Ensure they have ordered
enough Staff to be onsite to preform
If Work siteaconditions change and this 1. Client 1. Monitor work site conditions
1. Provide path for VRU duties
Works impact on 2 .Ensure
Contactthat
details
Source
2. / Event
Use Signs andbecomes
Devices atoconcern
delineate a Site
and 2. TGSsupplied
is drafted to
existing crossings Works impact on existing crossings Not present 2. TMD 3. Report any changes to conditions
Present at at this
this Rare Minor Low
Specific
direct theRisk
VRU Assessment shall be accommodate VRU
resulting in VRU resulting in VRU unable to use the location Moderate Major High undertaken Unlikely Major Medium to Ensure
PC or Supervisor
3. Provide aand if the
Traffic situationorisSite
controller unable to
works 3. that Signs and Devices
unable to use the existing crossing route 3. TMI 4 Report anyaschanges
beassist
to addressed
VRU AtContact Supervisors
Crossing points and/or are installed per theto the Team
TGS
existing crossing route TMD for further actions leader
4. Ensure that they are stationed in
4. TC
a position to guide or chaperone
VRU around the site safety
6 1. Ensure they have ordered
enough Staff to be onsite to preform
1. Use Signs and Devices to delineate and 1. Client
If Work site conditions change and this duties
1. Monitor work site conditions
direct the Cyclist onto a safe path
Source / Event becomes a concern a Site 2.
2 .Ensure
Contactthat TGSsupplied
details is drafted to
Cyclist transitioning to footpath and 2. Use Cyclist Signage and place a Traffic 2. TMD
Present
Not at at
present this
this Specific Risk Assessment shall be accommodate Cyclist to conditions
3. Report any changes
colliding with pedestrians Likely
Rare Moderate
Minor High
Low Controller at start of the shared zone to give Unlikely Major Medium
location undertaken and if the situation is unable to 3.
to Ensure that Signs and Devices
PC or Supervisor
verbal instructions 3. TMI
be addressed Contact Supervisors and/or are installed
4 Report anyas per theto
changes TGS
the Team
TMD for further actions 4. Ensure that they are stationed in
leader
High cycle volumes on 4. TC a position to guide or instruct the
road or in defined Cyclist
bicycle lane / shoulder
which is impacted by 1. Ensure they have ordered
works enough Staff to be onsite to preform
If Work
1. site conditions
Use Signs and Deviceschange and thisand
to delineate 1. Client 1. Monitor work site conditions
duties
Cyclist merge with general traffic Source
direct / Event
the Cyclistbecomes
onto a safea concern
path a Site 2 .Ensure
2. Contactthat
details
TGSsupplied
is drafted to
Not present 2. TMD 3. Report any changes
Cyclist to conditions
lanes at unsafe location or in unsafe Present at at this
this Rare Minor Low
Extreme
Specific
2. ProvideRisk Assessment
a Speed shall
reduction be Cyclist
if the accommodate
location Likely Major undertaken Unlikely Major Medium to Ensure
PC or Supervisor
manner leading to collision with other location are to share and if the with
the road situation is unable to
the vehicles 3. that Signs and Devices
be addressed Contact Supervisors and/or 3. TMI 4 Report
are anyas
installed changes
per the to the Team
TGS
road vehicles
TMD for further actions leader
4. Ensure that they are stationed in
4. TC a position to guide or instruct the
Cyclist
7 1. Ensure they have ordered
enough Staff to be onsite to preform
If Work site conditions change and this 1. Client duties
1. Monitor work site conditions
TTM devices and 1. Ensure
Source all devises
/ Event installed
becomes are nota Site
a concern 2.
2 .Ensure
Contactthat TGSsupplied
details is drafted so
signage are located in Not present
Present at at this
this placed
SpecificinRisk
Cycle lanes and pathways
Assessment shall be 2. TMD that no devices
3. Report are placed
any changes in
to conditions
road shoulders, bicycle Cyclists colliding with TTM devices Likely
Rare Moderate
Minor High
Low Unlikely Moderate Medium
location
location undertaken and if the situation is unable to pathways or cycle lanes
to PC or Supervisor
lanes, or immediately be addressed Contact Supervisors and/or 3. TMI 3. Ensureany
4 Report thatchanges
Signs and to Devices
the Team
adjacent to paths TMD for further actions are installed as per the TGS
leader
4. TC
Page 7
www.invarion.com
Potential Risk Initial Risk Control Measures Revised Risk Actions
Source Event Risk Evaluation Likelihood Consequence Rating Options Likelihood Consequence Rating Who What
School Zones and Crossings
8
1. Ensure they have ordered
enough Staff to perform duties and
1.Work
If Workssiteto conditions
be undertaken outside
change and of
thispeak 1. Client 1. Monitor work site conditions
works are undertaken outside of
hour school times 2 . Contact
Source / Event becomes a concern a Site peak times details supplied
Children crossing the road in an 2. Additional
Risk traffic control shall
utilised
beas extra 2. TMD 3.
Safe school crossing Not present
Present at at this
this Likely Major
Specific Assessment 2. Report
Ensure any
thatchanges to conditions
TGS is drafted to
unsafe and unpredictable manner in location Rare Minor Extreme
Low precautions for pedestrians to guide
undertaken and if the situation is unable pastto Unlikely Major Medium to PC or Supervisor
practices compromised accommodate pedestrians
and around the site theaddressed
work area Contact Supervisors and/or 3. TMI 4
be 3.Report
Ensureanythatchanges to the
Signs and Team
Devices
3. Install
TMD pedestrian
for further signage
actions leader
are installed as per the TGS
4. TC
4. Ensure that they are stationed in
a position to guide or instruct ped's
9
1. Ensure work is ceased during
1. Maintain
If Work site all trafficable
conditions lanes and
change duringthisthe 1. Client peak hour times
1. Monitor work site conditions
peak traffic times
Source / Event becomes a concern a Site 2.
2 . Contactthat
Ensure TGSsupplied
details is drafted to
Increase of Vehicle and 2. Stop work accommodate no workstoduring
pedestrian traffic during Not present
Present atat this
this Specific Risk during peak hour
Assessment shalltraffic
be as to 2. TMD 3. Report any changes conditions
Pedestrian and Vehicle accidents location Rare
Likely Minor
Major Low
Extreme reduce distracted drivers whilst increased
undertaken and if the situation is unable to Unlikely Major Medium peak
to PCtimes
or Supervisor
school drop off and pick location
pedestrians
be addressed Contact Supervisors and/or 3. TMI 3. Ensureany
4 Report thatchanges
Signs andto Devices
the Team
up times up 3. Install prewarning signage are installed as per the TGS
TMD for further actions leader
4. TC 4. Ensure that they are stationed in
a position to guide or instruct VRU's
10
1. Ensure work is ceased during
1. Install barrier systems to reduce access
peak hour times and have ordered
points
If Workinto
sitethe work area
conditions change and this 1. Client 1. Monitor work siteonsite
conditions
enough Staff to be
2. Works/ Event
to be undertaken
becomes aoutside
concernofapeak 2
Source Site 2..Ensure
Contactthat details
TGSsupplied
is drafted to
Not present hour school times
Specific Risk Assessment shall be 2. TMD 3. Report any changes to conditions
Increase in pedestrians Present at at this
this accommodate barrier systems and
Pedestrians accessing the work area Rare
Likely Minor
Major Low
Extreme 3. Additionaland
undertaken traffic control
if the utilised
situation as extra
is unable to Unlikely Major Medium to PCofforby
Supervisor
near the work area location sign competent person
precautions for pedestrians to guide past 3. TMI 4
be addressed Contact Supervisors and/or 3.Report
Ensureany thatchanges
Signs andto the Team
Devices
the work
TMD area actions
for further leader
are installed as per the TGS
4. Install pedestrian signage 4. TC 4. Ensure that they are stationed in
a position to guide VRU's
Potential Risk Risk Evaluation Initial Risk Control Measures Revised Risk Actions
Source Event Likelihood Consequence Rating Options Likelihood Consequence Rating Who What
Traffic Impacts
11
1. Ensure that the work area does not
1. Ensure works are undertaken
exceed what is described in table 5.4 1. Client
Dangerous / aggressive driver If Work sitelength
conditions changeunder
and this outside
1. Monitorof peak
work hours
site conditions
Maximum of operation shuttle
behavior resulting from excessive Source / Event becomes a concern a Site 2. Ensure that TGSsupplied
2 . Contact details is drafted and
flow 2. TMD
Not present queue lengths
3. Report are calculated
any changes as per
to conditions
length of queues because of time Present at at this
this Rare
Likely Minor
Major Low
Extreme
Specific
2. Working Risk Assessment
outside of peakshall
hour be
times
needed to manage reversible flow location undertaken and if the traffic
situation is unable to Unlikely Major Medium the traffic volume
to PC or Supervisor
location 3. Prioritise releasing on higher 3. TMI
leading to lack of community / road be addressed Contact Supervisors and/or 3. Ensureany
4 Report thatchanges
Signs andto Devices
the Team
volume roads where traffic queues are the
user acceptance of the worksite TMD for further actions are installed
leader as per the TGS
longest 4. TC 4. Ensure that they positioned as
4. Monitor queues and making sure not to
per the TGS and monitoring queues
exceed queue lengths
1. Ensure have ordered enough
1. Traffic Control to maintain visual of Staff to preform duties & ensure all
If Workat
access site
allconditions
times and change and driver
signal/radio this & 1. Client 1. Monitorare
residents work site of
aware conditions
works
Infrequently used property access in Source
site when/ Event
vehiclebecomes
is safe toaexit
concern a Site 2 .Ensure
2. Contact details
that TGSsupplied
is drafted to
Excessive length of Not present
Present at this
at this Specific
2. AdviseRisk Assessment
residents prior to shall
worksbeto signal 2. TMD 3. Report any changes
accommodate to conditions
property accesses
the middle of the site may not be Moderate
Rare Major
Minor High
Low Rare Major Low
worksite, including location
location undertaken
traffic and if the when
control/workers situation is unable
wanting to
to exit to Ensure
3. PC or Supervisor
that Signs and Devices
adequately monitored resulting in
rural areas be addressed
property and waitContact Supervisorstoand/or
for confirmation safely 3. TMI 4 Report
are anyaschanges
installed per the to
TGSthe Team
unsafe site entry
TMD for further actions
exit leader
4. Ensure that they are stationed in
4. TC a position to assist entry & egress
to properties
1. Ensure work area does not exceed lengths in 1. Ensure works are undertaken
table 5.4 Max. length under shuttle flow outside of peak hours
2. Working
If Work siteoutside of peak
conditions hour times
change and this 1. Client 1. Ensure
2. Monitorthat
workTGS
site isconditions
drafted and
3. Prioritise
Source traffic becomes
/ Event on higher volume
a concernroads where
a Site 2 . Contact
queue details
lengths supplied as per
are calculated
Long queues combined with Not present traffic queues are the longest 2. TMD 3. Report any changes to conditions
Present at at this
this Specific Risk Assessment shall be the traffic volume & repeated PTS
Inadequate warning of traffic queue location Likely
Rare Major
Minor Extreme
Low 4. Monitor queues and making sure not to
undertaken and if the situation is unable to Rare Major Low to PCused
or Supervisor
location exceed queue lengths signs if required
results in collision at end of queue beEnsure
addressed Contactsignage
Supervisors and/or 3. TMI 4 Report
3. Ensureanythatchanges
Signs and to Devices
the Team
5. that repeater is installed as
TMD
per for further
figures actions
4.5 & 4.6 leader
are installed as per the TGS
4. TC 4. Ensure that they positioned as
6. Ensure 60kph speed zone is implemented 1
sign spacing prior to the primary PTS sign per the TGS and monitoring queues
The text continues on page 8.
Used in these records