Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Response to Information Request 10-6-2025 Traffic guidance scheme · OPW25/0042

of 16

Text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                                                                                                                                              www.invarion.com
                                    Potential Risk                                                       Initial Risk                            Control Measures                                   Revised Risk                               Actions
        Source                            Event                     Risk Evaluation        Likelihood   Consequence     Rating                         Options                         Likelihood   Consequence    Rating        Who                     What
Vulnerable Road Users - pedestrians, cyclists, people with disabilities and wheeled path users
4
                                                                                                                                                                                                                                        1. Correct Staff ordered to preform
                                                                                                                                  1.Work
                                                                                                                                     Provide                                                                                            duties and regular inspection are made
                                                                                                                                  If       siteaconditions
                                                                                                                                                 path for VRUchange and this                                                1. Client   1.  Monitor work site conditions
                                                                                                                                                                                                                                        to ensure that is is safe
                                                                                                                                  2. Use Signs    and   Devicesatoconcern
                                                                                                                                                                     delineate  and                                                     2
                          Path route is damaged creating slip /                                                                   Source   / Event  becomes                   a Site                                                    2. .Ensure
                                                                                                                                                                                                                                             Contact details
                                                                                                                                                                                                                                                   that TGS issupplied
                                                                                                                                                                                                                                                                drafted to
                                                                   Not present                                                    direct theRisk
                                                                                                                                              VRU                                                                           2. TMD      3.  Report  any  changes   to conditions
                          trip / fall hazards for path users or     Present  atat this
                                                                                this        Rare           Minor         Low
                                                                                                                                  Specific        Assessment shall be                                                                   accommodate VRU
                                                                        location           Moderate       Major          High     3. Provide aand
                                                                                                                                  undertaken     Traffic  controller
                                                                                                                                                     if the situationorisSite worker
                                                                                                                                                                          unable  to    Unlikely       Major       Medium               to  PC or Supervisor
                          hazards when path users need to               location                                                                                                                                                        3. Ensure  that Signs and Devices are
                          pass each other                                                                                         to assist
                                                                                                                                  be         regularly
                                                                                                                                     addressed          check
                                                                                                                                                   Contact      for any hazards
                                                                                                                                                             Supervisors    and/or                                          3. TMI      4  Reportas
                                                                                                                                                                                                                                        installed  any
                                                                                                                                                                                                                                                     perchanges
                                                                                                                                                                                                                                                         the TGS to the Team
                                                                                                                                  alongfor
                                                                                                                                  TMD    thefurther
                                                                                                                                              route actions                                                                             leader
                                                                                                                                                                                                                                        4. Ensure that they are stationed in a
                                                                                                                                                                                                                            4. TC       position to guide or chaperone VRU
                                                                                                                                                                                                                                        around the site safety

                                                                                                                                                                                                                                        1. Ensure they have ordered
                                                                                                                                                                                                                            1. Client   enough Staff to be onsite to preform
                                                                                                                                  If Work
                                                                                                                                  1.       siteaconditions
                                                                                                                                     Provide     path for VRUchange and this                                                            1. Monitor work site conditions
                                                                                                                                                                                                                                        duties
Works activities                                                                                                                  Source
                                                                                                                                  2.       / Event
                                                                                                                                     Use Signs    andbecomes
                                                                                                                                                       Devices atoconcern
                                                                                                                                                                    delineate a Site
                                                                                                                                                                                and                                                     2 .Ensure
                                                                                                                                                                                                                                        2.  Contactthat
                                                                                                                                                                                                                                                      details
                                                                                                                                                                                                                                                         TGSsupplied
                                                                                                                                                                                                                                                              is drafted to
                          VRUs Confused by TTM layouts and                                                                                                                                                                  2. TMD
impacting on                                                       Not present
                                                                    Present  at at this
                                                                                this                                              Specific
                                                                                                                                  direct theRisk
                                                                                                                                              VRUAssessment shall be                                                                    3. Report any changes
                                                                                                                                                                                                                                        accommodate      VRU      to conditions
                          follow incorrect route into the work                             Moderate
                                                                                            Rare           Major
                                                                                                           Minor         High
                                                                                                                         Low                                                           Unlikely        Major       Medium
existing or temporary                                                   location
                                                                        location                                                  undertaken
                                                                                                                                  3. Provide aand    if the
                                                                                                                                                 Traffic    situationorisSite
                                                                                                                                                         controller       unable  to
                                                                                                                                                                              works                                                     to Ensure
                                                                                                                                                                                                                                        3. PC or Supervisor
                                                                                                                                                                                                                                                    that Signs and Devices
                          area                                                                                                                                                                                              3. TMI
path routes                                                                                                                       beassist
                                                                                                                                  to  addressed    Contactthe
                                                                                                                                            VRU around       Supervisors
                                                                                                                                                                work areaand/or                                                         4 Report
                                                                                                                                                                                                                                        are        anyas
                                                                                                                                                                                                                                            installed   changes
                                                                                                                                                                                                                                                          per theto the Team
                                                                                                                                                                                                                                                                  TGS
                                                                                                                                  TMD for further actions                                                                               leader
                                                                                                                                                                                                                                        4. Ensure that they are stationed in
                                                                                                                                                                                                                            4. TC
                                                                                                                                                                                                                                        a position to guide or chaperone
                                                                                                                                                                                                                                        VRU around the site safety
                                                                                                                                                                                                                                        1. Ensure they have ordered
                                                                                                                                                                                                                            1. Client   enough Staff to be onsite to preform
                                                                                                                                  If Work
                                                                                                                                  1.       sitea conditions
                                                                                                                                     Provide     path for VRUchange and this                                                            1. Monitor work site conditions
                                                                                                                                                                                                                                        duties
                                                                                                                                  Source
                                                                                                                                  2.       / Event
                                                                                                                                     Use Signs    andbecomes
                                                                                                                                                       Devices atoconcern
                                                                                                                                                                    delineatea Site
                                                                                                                                                                               and                                                      2 .Ensure
                                                                                                                                                                                                                                        2.  Contactthat
                                                                                                                                                                                                                                                      details
                                                                                                                                                                                                                                                         TGSsupplied
                                                                                                                                                                                                                                                              is drafted to
                          VRUs Confused by TTM layouts and                                                                                                                                                                  2. TMD      3. Report any changes      to conditions
                                                                   Not present
                                                                    Present   at at this
                                                                                 this                                             Specific
                                                                                                                                  direct theRisk
                                                                                                                                             VRUAssessment shall be                                                                     accommodate      VRU
                          follow incorrect route around the site         location          Moderate
                                                                                            Rare           Major
                                                                                                           Minor         High
                                                                                                                         Low      undertaken                                           Unlikely        Major       Medium               to Ensure
                                                                                                                                                                                                                                           PC or Supervisor
                                                                        location                                                  3. Provide a and   if the
                                                                                                                                                 Traffic    situation
                                                                                                                                                         controller orisSite
                                                                                                                                                                         unable  to
                                                                                                                                                                             works                                          3. TMI      3.          that Signs and Devices
                          due to no clear route                                                                                                                                                                                         4 Report   anyaschanges
                                                                                                                                  beassist
                                                                                                                                  to  addressed    Contactthe
                                                                                                                                            VRU around       Supervisors
                                                                                                                                                                work areaand/or                                                         are installed     per the to the Team
                                                                                                                                                                                                                                                                   TGS
                                                                                                                                  TMD for further actions                                                                               leader
                                                                                                                                                                                                                                        4. Ensure that they are stationed in
                                                                                                                                                                                                                            4. TC
                                                                                                                                                                                                                                        a position to guide or chaperone
                                                                                                                                                                                                                                        VRU around the site safety
5
                                                                                                                                                                                                                                        1. Ensure they have ordered
                                                                                                                                                                                                                                        enough Staff to be onsite to preform
                                                                                                                                  If Work  siteaconditions   change and this                                                1. Client   1. Monitor work site conditions
                                                                                                                                  1. Provide     path for VRU                                                                           duties
Works impact on                                                                                                                                                                                                                         2 .Ensure
                                                                                                                                                                                                                                           Contactthat
                                                                                                                                                                                                                                                     details
                                                                                                                                  Source
                                                                                                                                  2.       / Event
                                                                                                                                     Use Signs    andbecomes
                                                                                                                                                       Devices atoconcern
                                                                                                                                                                    delineate a Site
                                                                                                                                                                                and                                                     2.              TGSsupplied
                                                                                                                                                                                                                                                             is drafted to
existing crossings        Works impact on existing crossings       Not present                                                                                                                                              2. TMD      3. Report any changes    to conditions
                                                                    Present  at at this
                                                                                this        Rare           Minor         Low
                                                                                                                                  Specific
                                                                                                                                  direct theRisk
                                                                                                                                              VRU Assessment shall be                                                                   accommodate     VRU
resulting in VRU          resulting in VRU unable to use the            location           Moderate        Major         High     undertaken                                            Unlikely       Major       Medium               to Ensure
                                                                                                                                                                                                                                           PC or Supervisor
                                                                                                                                  3. Provide aand    if the
                                                                                                                                                 Traffic    situationorisSite
                                                                                                                                                         controller       unable  to
                                                                                                                                                                              works                                                     3.         that Signs and Devices
unable to use the         existing crossing route                                                                                                                                                                           3. TMI      4 Report  anyaschanges
                                                                                                                                  beassist
                                                                                                                                  to  addressed
                                                                                                                                             VRU AtContact   Supervisors
                                                                                                                                                      Crossing   points and/or                                                          are installed    per theto the Team
                                                                                                                                                                                                                                                                 TGS
existing crossing route                                                                                                           TMD for further actions                                                                               leader
                                                                                                                                                                                                                                        4. Ensure that they are stationed in
                                                                                                                                                                                                                            4. TC
                                                                                                                                                                                                                                        a position to guide or chaperone
                                                                                                                                                                                                                                        VRU around the site safety
6                                                                                                                                                                                                                                       1. Ensure they have ordered
                                                                                                                                                                                                                                        enough Staff to be onsite to preform
                                                                                                                                  1. Use Signs and Devices to delineate and                                                 1. Client
                                                                                                                                  If Work site conditions change and this                                                               duties
                                                                                                                                                                                                                                        1. Monitor work site conditions
                                                                                                                                  direct the Cyclist onto a safe path
                                                                                                                                  Source / Event becomes a concern a Site                                                               2.
                                                                                                                                                                                                                                        2 .Ensure
                                                                                                                                                                                                                                           Contactthat  TGSsupplied
                                                                                                                                                                                                                                                     details is drafted to
                          Cyclist transitioning to footpath and                                                                   2. Use Cyclist Signage and place a Traffic                                                2. TMD
                                                                    Present
                                                                   Not       at at
                                                                       present  this
                                                                                   this                                           Specific Risk Assessment shall be                                                                     accommodate     Cyclist to conditions
                                                                                                                                                                                                                                        3. Report any changes
                          colliding with pedestrians                                         Likely
                                                                                             Rare        Moderate
                                                                                                          Minor          High
                                                                                                                         Low      Controller at start of the shared zone to give        Unlikely       Major       Medium
                                                                        location                                                  undertaken and if the situation is unable to                                                          3.
                                                                                                                                                                                                                                        to Ensure  that Signs and Devices
                                                                                                                                                                                                                                           PC or Supervisor
                                                                                                                                  verbal instructions                                                                       3. TMI
                                                                                                                                  be addressed Contact Supervisors and/or                                                               are installed
                                                                                                                                                                                                                                        4 Report  anyas  per theto
                                                                                                                                                                                                                                                       changes   TGS
                                                                                                                                                                                                                                                                   the Team
                                                                                                                                  TMD for further actions                                                                               4. Ensure that they are stationed in
                                                                                                                                                                                                                                        leader
High cycle volumes on                                                                                                                                                                                                       4. TC       a position to guide or instruct the
road or in defined                                                                                                                                                                                                                      Cyclist
bicycle lane / shoulder
which is impacted by                                                                                                                                                                                                                    1. Ensure they have ordered
works                                                                                                                                                                                                                                   enough Staff to be onsite to preform
                                                                                                                                  If Work
                                                                                                                                  1.       site conditions
                                                                                                                                     Use Signs   and Deviceschange    and thisand
                                                                                                                                                                to delineate                                                1. Client   1. Monitor work site conditions
                                                                                                                                                                                                                                        duties
                          Cyclist merge with general traffic                                                                      Source
                                                                                                                                  direct   / Event
                                                                                                                                         the Cyclistbecomes
                                                                                                                                                     onto a safea concern
                                                                                                                                                                   path a Site                                                          2 .Ensure
                                                                                                                                                                                                                                        2.  Contactthat
                                                                                                                                                                                                                                                      details
                                                                                                                                                                                                                                                         TGSsupplied
                                                                                                                                                                                                                                                              is drafted to
                                                                   Not present                                                                                                                                              2. TMD      3. Report any changes
                                                                                                                                                                                                                                                         Cyclist to conditions
                          lanes at unsafe location or in unsafe     Present   at at this
                                                                                 this        Rare          Minor          Low
                                                                                                                        Extreme
                                                                                                                                  Specific
                                                                                                                                  2. ProvideRisk Assessment
                                                                                                                                              a Speed            shall
                                                                                                                                                         reduction      be Cyclist
                                                                                                                                                                    if the                                                              accommodate
                                                                         location            Likely        Major                  undertaken                                           Unlikely        Major       Medium               to Ensure
                                                                                                                                                                                                                                           PC or Supervisor
                          manner leading to collision with other        location                                                  are to share and  if the with
                                                                                                                                                the road   situation  is unable to
                                                                                                                                                                the vehicles                                                            3.          that Signs and Devices
                                                                                                                                  be addressed Contact Supervisors and/or                                                   3. TMI      4 Report
                                                                                                                                                                                                                                        are        anyas
                                                                                                                                                                                                                                            installed   changes
                                                                                                                                                                                                                                                          per the to the Team
                                                                                                                                                                                                                                                                   TGS
                          road vehicles
                                                                                                                                  TMD for further actions                                                                               leader
                                                                                                                                                                                                                                        4. Ensure that they are stationed in
                                                                                                                                                                                                                            4. TC       a position to guide or instruct the
                                                                                                                                                                                                                                        Cyclist
7                                                                                                                                                                                                                                       1. Ensure they have ordered
                                                                                                                                                                                                                                        enough Staff to be onsite to preform
                                                                                                                                  If Work site conditions change and this                                                   1. Client   duties
                                                                                                                                                                                                                                        1. Monitor work site conditions
TTM devices and                                                                                                                   1. Ensure
                                                                                                                                  Source      all devises
                                                                                                                                           / Event        installed
                                                                                                                                                     becomes        are nota Site
                                                                                                                                                               a concern                                                                2.
                                                                                                                                                                                                                                        2 .Ensure
                                                                                                                                                                                                                                            Contactthat  TGSsupplied
                                                                                                                                                                                                                                                      details  is drafted so
signage are located in                                             Not present
                                                                    Present   at at this
                                                                                 this                                             placed
                                                                                                                                  SpecificinRisk
                                                                                                                                             Cycle  lanes and pathways
                                                                                                                                                  Assessment    shall be                                                    2. TMD      that  no devices
                                                                                                                                                                                                                                        3. Report         are placed
                                                                                                                                                                                                                                                    any changes         in
                                                                                                                                                                                                                                                                    to conditions
road shoulders, bicycle   Cyclists colliding with TTM devices                                Likely
                                                                                             Rare        Moderate
                                                                                                          Minor          High
                                                                                                                         Low                                                           Unlikely      Moderate      Medium
                                                                         location
                                                                        location                                                  undertaken and if the situation is unable to                                                          pathways    or cycle lanes
                                                                                                                                                                                                                                        to PC or Supervisor
lanes, or immediately                                                                                                             be addressed Contact Supervisors and/or                                                   3. TMI      3. Ensureany
                                                                                                                                                                                                                                        4 Report    thatchanges
                                                                                                                                                                                                                                                         Signs and to Devices
                                                                                                                                                                                                                                                                      the Team
adjacent to paths                                                                                                                 TMD for further actions                                                                               are  installed as per the TGS
                                                                                                                                                                                                                                        leader
                                                                                                                                                                                                                            4. TC

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request 10-6-2025 Traffic guidance scheme.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.