Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Response to Information Request 10-6-2025 Traffic guidance scheme · OPW25/0042

of 16

Text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                                                                                                                                                 www.invarion.com

                                    Potential Risk                                                      Initial Risk                            Control Measures                                       Revised Risk                               Actions
         Source                            Event                   Risk Evaluation        Likelihood   Consequence     Rating                          Options                            Likelihood   Consequence    Rating        Who                      What
    School Zones and Crossings
8
                                                                                                                                                                                                                                           1. Ensure they have ordered
                                                                                                                                                                                                                                           enough Staff to perform duties and
                                                                                                                                 1.Work
                                                                                                                                 If Workssiteto conditions
                                                                                                                                                be undertaken     outside
                                                                                                                                                             change    and of
                                                                                                                                                                           thispeak                                            1. Client   1.  Monitor  work site conditions
                                                                                                                                                                                                                                           works    are undertaken  outside of
                                                                                                                                 hour  school   times                                                                                      2  . Contact
                                                                                                                                 Source / Event becomes a concern a Site                                                                   peak   times details supplied
                          Children crossing the road in an                                                                       2. Additional
                                                                                                                                            Risk traffic control shall
                                                                                                                                                                 utilised
                                                                                                                                                                        beas extra                                             2. TMD      3.
Safe school crossing                                              Not present
                                                                   Present  at at this
                                                                               this         Likely        Major
                                                                                                                                 Specific         Assessment                                                                               2. Report
                                                                                                                                                                                                                                               Ensure any
                                                                                                                                                                                                                                                        thatchanges   to conditions
                                                                                                                                                                                                                                                             TGS is drafted  to
                          unsafe and unpredictable manner in           location             Rare          Minor        Extreme
                                                                                                                        Low      precautions    for pedestrians    to guide
                                                                                                                                 undertaken and if the situation is unable   pastto        Unlikely       Major       Medium               to  PC or Supervisor
practices compromised                                                                                                                                                                                                                      accommodate       pedestrians
                          and around the site                                                                                    theaddressed
                                                                                                                                      work area Contact Supervisors and/or                                                     3. TMI      4
                                                                                                                                 be                                                                                                        3.Report
                                                                                                                                                                                                                                               Ensureanythatchanges  to the
                                                                                                                                                                                                                                                             Signs and      Team
                                                                                                                                                                                                                                                                        Devices
                                                                                                                                 3. Install
                                                                                                                                 TMD        pedestrian
                                                                                                                                       for further        signage
                                                                                                                                                    actions                                                                                leader
                                                                                                                                                                                                                                           are installed as per the TGS
                                                                                                                                                                                                                               4. TC
                                                                                                                                                                                                                                           4. Ensure that they are stationed in
                                                                                                                                                                                                                                           a position to guide or instruct ped's
9
                                                                                                                                                                                                                                           1. Ensure work is ceased during
                                                                                                                                 1. Maintain
                                                                                                                                 If Work  site all trafficable
                                                                                                                                                conditions     lanes and
                                                                                                                                                             change   duringthisthe                                            1. Client   peak  hour times
                                                                                                                                                                                                                                           1. Monitor  work site conditions
                                                                                                                                 peak  traffic times
                                                                                                                                 Source / Event becomes a concern a Site                                                                   2.
                                                                                                                                                                                                                                           2 . Contactthat
                                                                                                                                                                                                                                              Ensure       TGSsupplied
                                                                                                                                                                                                                                                        details is drafted to
Increase of Vehicle and                                                                                                          2. Stop work                                                                                              accommodate     no workstoduring
pedestrian traffic during                                         Not present
                                                                    Present  atat this
                                                                                this                                             Specific   Risk during   peak hour
                                                                                                                                                 Assessment      shalltraffic
                                                                                                                                                                        be as to                                               2. TMD      3. Report any changes        conditions
                          Pedestrian and Vehicle accidents             location             Rare
                                                                                            Likely        Minor
                                                                                                          Major          Low
                                                                                                                       Extreme   reduce   distracted   drivers  whilst increased
                                                                                                                                 undertaken and if the situation is unable to              Unlikely       Major       Medium               peak
                                                                                                                                                                                                                                           to PCtimes
                                                                                                                                                                                                                                                  or Supervisor
school drop off and pick                                                location
                                                                                                                                 pedestrians
                                                                                                                                 be addressed Contact Supervisors and/or                                                       3. TMI      3. Ensureany
                                                                                                                                                                                                                                           4 Report   thatchanges
                                                                                                                                                                                                                                                           Signs andto Devices
                                                                                                                                                                                                                                                                       the Team
up times up                                                                                                                      3. Install prewarning     signage                                                                         are installed as per the  TGS
                                                                                                                                 TMD   for further   actions                                                                               leader
                                                                                                                                                                                                                               4. TC       4. Ensure that they are stationed in
                                                                                                                                                                                                                                           a position to guide or instruct VRU's

10
                                                                                                                                                                                                                                           1. Ensure work is ceased during
                                                                                                                                 1. Install barrier systems to reduce access
                                                                                                                                                                                                                                           peak hour times and have ordered
                                                                                                                                 points
                                                                                                                                 If Workinto
                                                                                                                                          sitethe  work area
                                                                                                                                               conditions    change and this                                                   1. Client   1. Monitor    work siteonsite
                                                                                                                                                                                                                                                                    conditions
                                                                                                                                                                                                                                           enough    Staff to be
                                                                                                                                 2. Works/ Event
                                                                                                                                            to be undertaken
                                                                                                                                                     becomes aoutside
                                                                                                                                                                   concernofapeak                                                          2
                                                                                                                                 Source                                        Site                                                        2..Ensure
                                                                                                                                                                                                                                              Contactthat details
                                                                                                                                                                                                                                                             TGSsupplied
                                                                                                                                                                                                                                                                   is drafted to
                                                                  Not present                                                    hour  school   times
                                                                                                                                 Specific Risk Assessment shall be                                                             2. TMD      3. Report any changes       to conditions
Increase in pedestrians                                            Present  at at this
                                                                               this                                                                                                                                                        accommodate       barrier systems   and
                          Pedestrians accessing the work area                               Rare
                                                                                            Likely        Minor
                                                                                                          Major         Low
                                                                                                                       Extreme   3. Additionaland
                                                                                                                                 undertaken      traffic control
                                                                                                                                                     if the      utilised
                                                                                                                                                            situation      as extra
                                                                                                                                                                       is unable  to       Unlikely       Major       Medium               to PCofforby
                                                                                                                                                                                                                                                      Supervisor
near the work area                                                     location                                                                                                                                                            sign          competent person
                                                                                                                                 precautions    for pedestrians    to guide  past                                              3. TMI      4
                                                                                                                                 be addressed Contact Supervisors and/or                                                                   3.Report
                                                                                                                                                                                                                                              Ensureany thatchanges
                                                                                                                                                                                                                                                             Signs andto the Team
                                                                                                                                                                                                                                                                         Devices
                                                                                                                                 the work
                                                                                                                                 TMD        area actions
                                                                                                                                       for further                                                                                         leader
                                                                                                                                                                                                                                           are installed as per the TGS
                                                                                                                                 4. Install pedestrian signage                                                                 4. TC       4. Ensure that they are stationed in
                                                                                                                                                                                                                                           a position to guide VRU's

                          Potential Risk                           Risk Evaluation                      Initial Risk                            Control Measures                                       Revised Risk                               Actions
          Source                                      Event                               Likelihood   Consequence     Rating                          Options                            Likelihood   Consequence    Rating        Who                      What
Traffic Impacts
11
                                                                                                                                 1. Ensure that the work area does not
                                                                                                                                                                                                                                           1. Ensure works are undertaken
                                                                                                                                 exceed what is described in table 5.4                                                         1. Client
                          Dangerous / aggressive driver                                                                           If Work sitelength
                                                                                                                                                conditions   changeunder
                                                                                                                                                                      and this                                                             outside
                                                                                                                                                                                                                                           1. Monitorof peak
                                                                                                                                                                                                                                                         work hours
                                                                                                                                                                                                                                                              site conditions
                                                                                                                                 Maximum             of operation           shuttle
                          behavior resulting from excessive                                                                       Source / Event becomes a concern a Site                                                                  2. Ensure    that TGSsupplied
                                                                                                                                                                                                                                           2 . Contact details    is drafted and
                                                                                                                                 flow                                                                                          2. TMD
                                                                  Not present                                                                                                                                                              queue   lengths
                                                                                                                                                                                                                                           3. Report         are calculated
                                                                                                                                                                                                                                                        any changes          as per
                                                                                                                                                                                                                                                                       to conditions
                          length of queues because of time         Present  at at this
                                                                               this         Rare
                                                                                           Likely         Minor
                                                                                                          Major          Low
                                                                                                                       Extreme
                                                                                                                                  Specific
                                                                                                                                 2.  Working Risk Assessment
                                                                                                                                               outside  of peakshall
                                                                                                                                                                   hour be
                                                                                                                                                                        times
                          needed to manage reversible flow             location                                                   undertaken    and if the traffic
                                                                                                                                                            situation is unable to        Unlikely        Major       Medium               the traffic volume
                                                                                                                                                                                                                                           to PC or Supervisor
                                                                       location                                                  3.  Prioritise releasing          on higher                                                   3. TMI
                          leading to lack of community / road                                                                     be addressed     Contact   Supervisors   and/or                                                          3. Ensureany
                                                                                                                                                                                                                                           4 Report     thatchanges
                                                                                                                                                                                                                                                             Signs andto Devices
                                                                                                                                                                                                                                                                         the Team
                                                                                                                                 volume    roads where    traffic queues are   the
                          user acceptance of the worksite                                                                         TMD for further actions                                                                                  are installed
                                                                                                                                                                                                                                           leader          as per the  TGS
                                                                                                                                 longest                                                                                       4. TC       4. Ensure that they positioned as
                                                                                                                                 4. Monitor queues and making sure not to
                                                                                                                                                                                                                                           per the TGS and monitoring queues
                                                                                                                                 exceed queue lengths
                                                                                                                                                                                                                                           1. Ensure have ordered enough
                                                                                                                                 1. Traffic Control to maintain visual of                                                                  Staff to preform duties & ensure all
                                                                                                                                  If Workat
                                                                                                                                 access    site
                                                                                                                                             allconditions
                                                                                                                                                 times and change     and driver
                                                                                                                                                            signal/radio   this &                                              1. Client    1. Monitorare
                                                                                                                                                                                                                                           residents    work   site of
                                                                                                                                                                                                                                                           aware    conditions
                                                                                                                                                                                                                                                                       works
                           Infrequently used property access in                                                                   Source
                                                                                                                                 site  when/ Event
                                                                                                                                             vehiclebecomes
                                                                                                                                                      is safe toaexit
                                                                                                                                                                  concern a Site                                                            2 .Ensure
                                                                                                                                                                                                                                           2.   Contact  details
                                                                                                                                                                                                                                                       that TGSsupplied
                                                                                                                                                                                                                                                                   is drafted to
Excessive length of                                               Not present
                                                                   Present    at this
                                                                           at this                                                Specific
                                                                                                                                 2.  AdviseRisk    Assessment
                                                                                                                                             residents  prior to shall
                                                                                                                                                                 worksbeto signal                                              2. TMD       3. Report any changes
                                                                                                                                                                                                                                           accommodate                  to conditions
                                                                                                                                                                                                                                                             property accesses
                           the middle of the site may not be                              Moderate
                                                                                           Rare           Major
                                                                                                          Minor         High
                                                                                                                        Low                                                                 Rare          Major        Low
worksite, including                                                    location
                                                                      location                                                    undertaken
                                                                                                                                 traffic        and if the when
                                                                                                                                         control/workers   situation  is unable
                                                                                                                                                                  wanting        to
                                                                                                                                                                            to exit                                                         to Ensure
                                                                                                                                                                                                                                           3.  PC or Supervisor
                                                                                                                                                                                                                                                       that Signs and Devices
                           adequately monitored resulting in
rural areas                                                                                                                       be addressed
                                                                                                                                 property   and waitContact Supervisorstoand/or
                                                                                                                                                      for confirmation      safely                                             3. TMI       4 Report
                                                                                                                                                                                                                                           are         anyaschanges
                                                                                                                                                                                                                                                installed     per the to
                                                                                                                                                                                                                                                                       TGSthe Team
                           unsafe site entry
                                                                                                                                  TMD for further actions
                                                                                                                                 exit                                                                                                       leader
                                                                                                                                                                                                                                           4.  Ensure that they are stationed in
                                                                                                                                                                                                                               4. TC       a position to assist entry & egress
                                                                                                                                                                                                                                           to properties
                                                                                                                                 1. Ensure work area does not exceed lengths in                                                            1. Ensure works are undertaken
                                                                                                                                 table 5.4 Max. length under shuttle flow                                                                  outside of peak hours
                                                                                                                                 2. Working
                                                                                                                                 If Work    siteoutside  of peak
                                                                                                                                                  conditions     hour times
                                                                                                                                                               change   and this                                               1. Client   1. Ensure
                                                                                                                                                                                                                                           2. Monitorthat
                                                                                                                                                                                                                                                        workTGS
                                                                                                                                                                                                                                                              site isconditions
                                                                                                                                                                                                                                                                      drafted and
                                                                                                                                 3. Prioritise
                                                                                                                                 Source         traffic becomes
                                                                                                                                            / Event     on higher volume
                                                                                                                                                                  a concernroads  where
                                                                                                                                                                               a Site                                                      2 . Contact
                                                                                                                                                                                                                                           queue         details
                                                                                                                                                                                                                                                   lengths       supplied as per
                                                                                                                                                                                                                                                             are calculated
                           Long queues combined with              Not present                                                    traffic queues    are  the longest                                                            2. TMD      3. Report   any changes      to conditions
                                                                   Present   at at this
                                                                                this                                             Specific Risk Assessment shall be                                                                         the traffic volume   & repeated    PTS
                           Inadequate warning of traffic queue          location            Likely
                                                                                            Rare          Major
                                                                                                          Minor        Extreme
                                                                                                                         Low     4. Monitor queues and making sure not to
                                                                                                                                 undertaken and if the situation is unable to               Rare          Major        Low                 to PCused
                                                                                                                                                                                                                                                  or Supervisor
                                                                       location                                                  exceed queue lengths                                                                                      signs        if required
                           results in collision at end of queue                                                                  beEnsure
                                                                                                                                      addressed      Contactsignage
                                                                                                                                                               Supervisors    and/or                                           3. TMI      4 Report
                                                                                                                                                                                                                                           3. Ensureanythatchanges
                                                                                                                                                                                                                                                             Signs and to Devices
                                                                                                                                                                                                                                                                          the Team
                                                                                                                                 5.           that repeater           is installed as
                                                                                                                                 TMD
                                                                                                                                 per     for further
                                                                                                                                      figures           actions
                                                                                                                                                4.5 & 4.6                                                                                  leader
                                                                                                                                                                                                                                           are installed as per the TGS
                                                                                                                                                                                                                               4. TC       4. Ensure that they positioned as
                                                                                                                                 6. Ensure 60kph speed zone is implemented 1
                                                                                                                                 sign spacing prior to the primary PTS sign                                                                per the TGS and monitoring queues

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request 10-6-2025 Traffic guidance scheme.pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.