Town Planning Report
Items Raised in Prelodgement Meeting Response
Plan – Driveways and Carparking Code It is noted that the subject site is comprised of
(specifically PO1, PO3, PO7, PO8, PO10 two lots which can reasonably be expected to
and PO18). each have an individual crossover.
11. Frontage Works: Frontage works are to be completed as part of
The development of the site will need to this application as noted in the plans
include the construction of frontage submitted alongside this application.
works across the full frontage of the site.
The works would be similar to that
undertaken on the adjoining properties
(road widening, kerb and channel and
footpath).
12. Stormwater: A stormwater management plan has been
It is noted that there is no downstream lodged alongside this application and
Council drainage system for the determines a suitable detention and discharge
development to connect to. The solution in order to appropriately discharge
development of the site would need a water from the site without impacting
stormwater drainage system that collects adjoining uses.
and controls the runoff and discharges to
a lawful point of discharge. Any
application will need to include a
Stormwater Management Plan prepared
by a Registered Professional Engineer of
Queensland (RPEQ). It is expected that the
SWMP will include a combination of
discharge to Elanda Street, detention and
on-site infiltration. Please note that
Council does not support the use of
pumps to discharge stormwater.
13. Services: Suitable connections can be achieved to the
It is expected that service connections for service connections within Elanda Street. An
water, power and telecommunications easement has not been included as part of
can be provided from the Elanda Street this application but can be negotiated if
frontage. deemed necessary.
It is noted that a sewer main extends
through the site adjacent to the rear
boundary. Unitywater will most likely
require the creation of an easement over
the sewer main and this easement may
impact on the design and location of
elements of the stormwater management
system. It is recommended that
Unitywater be contacted prior to further
design on the stormwater management
system.
Town Planning Report - 65-67 Elanda Street, Sunshine Beach 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.