      Items Raised in Prelodgement Meeting                                       Response
       Plan – Driveways and Carparking Code                  It is noted that the subject site is comprised of
       (specifically PO1, PO3, PO7, PO8, PO10                two lots which can reasonably be expected to
       and PO18).                                            each have an individual crossover.
 11. Frontage Works:                                         Frontage works are to be completed as part of
     The development of the site will need to                this application as noted in the plans
     include the construction of frontage                    submitted alongside this application.
     works across the full frontage of the site.
     The works would be similar to that
     undertaken on the adjoining properties
     (road widening, kerb and channel and
     footpath).
 12. Stormwater:                                             A stormwater management plan has been
     It is noted that there is no downstream                 lodged alongside this application and
     Council drainage system for the                         determines a suitable detention and discharge
     development to connect to. The                          solution in order to appropriately discharge
     development of the site would need a                    water from the site without impacting
     stormwater drainage system that collects                adjoining uses.
     and controls the runoff and discharges to
     a lawful point of discharge. Any
     application will need to include a
     Stormwater Management Plan prepared
     by a Registered Professional Engineer of
     Queensland (RPEQ). It is expected that the
     SWMP will include a combination of
     discharge to Elanda Street, detention and
     on-site infiltration. Please note that
     Council does not support the use of
     pumps to discharge stormwater.
 13. Services:                                               Suitable connections can be achieved to the
     It is expected that service connections for             service connections within Elanda Street. An
     water, power and telecommunications                     easement has not been included as part of
     can be provided from the Elanda Street                  this application but can be negotiated if
     frontage.                                               deemed necessary.

       It is noted that a sewer main extends
       through the site adjacent to the rear
       boundary. Unitywater will most likely
       require the creation of an easement over
       the sewer main and this easement may
       impact on the design and location of
       elements of the stormwater management
       system. It is recommended that
       Unitywater be contacted prior to further
       design on the stormwater management
       system.


Town Planning Report - 65-67 Elanda Street, Sunshine Beach                                                   8
Log in to download the original file

TOWN PLANNING REPORT.PDF · 3.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.