Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Town Planning Report

of 78

Page text shows just the words. Original shows the document exactly as it was published.

5.4 Staging
No staging is proposed as part of the proposal.

5.5 Infrastructure Charges
In accordance with the Noosa Shire Council Charges Resolution (No. 6) 2021, infrastructure
charges are to be imposed in the following manner. The below charges and credits relate
to those to be imposed by Noosa Shire Council and their associated distributor-retailer,
Unitywater.

Credits for Existing or Previous Uses:

    Credit use           Credit          Total          NSC value     UW value    Number of credit     Value of
                          unit         value per           per          per           units             Credit
                                       demand            demand       demand
                                          unit             unit         unit
 Lot                  Each            $30,677.65        $18,406.59   $12,271.06           2          $61,355.30
                      residential
                      lot
                                                                                  Total Credit:      $61,355.30



Demand Charges:

  Demand use            Demand            Total         BCC value    QUU value      Number of         Demand
                          unit          value per          per          per        demand units        Value
                                        demand           demand       demand
                                           unit            unit         unit
 Multiple             Per 3 or         $30,677.65       $18,406.59   $12,271.06           4          $122,710.60
 Dwelling             more
                      bedroom
                                                                                  Gross Charge:      $122,710.60
                                                                                  Credits:           $61,355.30
                                                                                  Net Charge:        $61,355.30



Trunk Infrastructure / Offsets
The proposed development does not involve the construction or dedication of trunk works
and is consequently not subject to an Infrastructure Charge Offset.

5.6 Approval Requirements
In accordance with Section 85 of the Planning Act 2016, a Currency Period of 6 years is
requested for the first Material Change of Use applied for.




Town Planning Report - 65-67 Elanda Street, Sunshine Beach                                                    23
Log in to download the original file

TOWN PLANNING REPORT.PDF · 3.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.