Original source · versioned page text
Town Planning Report
Table 7.2.6.3—Coastal Communities Local Plan Code
Performance outcomes Acceptable outcomes Response
For uses that do not employ a caretaker or central management, the
maximum distance between waste storage areas and the kerbside is
60 metres.
AO3.4 Performance Outcome
Pathways used to transport bins: The bin storage areas are located in a safe and convenient location.
a. have a maximum grade of 1:15; and The nature of the use being for residential multiple dwellings will
b. are free of steps, stairs or other impediments. allow future residents the ability to relocate their bins to the kerb for
collection.
PO4 AO4.1 Complies
Waste storage areas are designed for ease of maintenance and ease Waste storage areas are constructed of impermeable and durable The waste storage areas are constructed of impermeable and
of access for cleaning. surfaces that are easily cleaned. durable surfaces.
AO4.2 Complies
Sufficient space is provided between and around waste storage bins The waste storage areas are suitably sized.
to allow for manoeuvring and washing of bins.
PO5 No acceptable outcome provided Complies
Waste storage areas provide a safe and secure environment for users The areas are separate from the public realm and are easily accessed
through: for each dwelling.
a. appropriate siting and access;
b. the provision of lighting; and
c. restricting access to the general public by making the area
clearly identifiable as private space.
Editor’s note— The use of landscaping, a change of paving material
or fencing are examples of delineating a waste storage area. The
locking of the area is not preferred and should be avoided.
Water management
PO6 AO6 Performance Outcome
Waste storage areas are designed to contain and appropriately The waste storage area is constructed of impermeable and durable Waste storage areas are designed to contain and appropriately
dispose of leakage from bins and wastewater from bin washing. surfaces and: dispose of leakage from bins and wastewater from bin washing.
a. is bunded and graded so that washwater and bin leakage Waste/leakage can be easily removed and cleaned to avoid impacts
are drained to the sewer or an on-site effluent disposal on future residents.
system via a gully within the storage area;
b. has a bund wall with a maximum height of 100 millimetres;
Town Planning Report - 65-67 Elanda Street, Sunshine Beach 73
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.