Original source · versioned page text
Owner's Consent - Cooroibah
Attached to the e-mail Changed MCU application addition of OPW Application MCU16/0099 & OPW16/0218.
Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.
Ref: Cooroibah (Timms GF Proposal) Date: 27/08/15 NBN Co Limited c/- Aurecon GPO Box 331 BRISBANE QLD 4001 OWNERS CONSENT |, Rebekah Timms, being the registered owner of the property described as Part of Lot 47 RP 136461 hereby grant NBN Co Limited the right to lodge on our behalf any applications required for Town Planning and/or Building Approval for the establishment of telecommunications infrastructure on the abovementioned property. Dated this iJ th day of. September , 2015 To, Reloakah Tams Authorised Signatory (see note below) Position Full Name Please note under the Sustainable Planning Act 2009 the guidelines for owners consent are; ef there are multiple owners a signature is required from each one e The ACN Number and if the owner of the land is a company two (2) directors of the company or a director and a company secretary e ORifa sole director and no Secretary, the owner consent must clarify that the person is the sole Director is also the sole Secretary. e Acompany seal can be used if witnessed by two company directors or a director and a company secretary. » If the land is leased the lessor must sign the form. « Where the owner is identified as a Body Corporate, a Body Corporate Seal and Body Corporate resolution consenting the proposal & two signatures (one of which must be the chairperson OR e Body Corporate Seal and a letter of consent signed by chairperson and secretary OR ¢ Assigned letter of consent from each lot owner covered by the Body Corporate.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.