Skip to the record
The only place to find full transcripts.

Original source · versioned page text

SUPERSEDED - Approved Plan - OPW23/0084

of 68

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                            o   If a Koala is present within 100m, clearing must cease temporarily and a
                                                safe buffer must be determined by the FSC.
                                            o   The FSC must continue to assess the Koala for signs of distress.
                                            o   If the Koala comes down from the tree, clearing must cease until the FSC
                                                determines it can continue.
                                            o   Vegetation must be cleared such that a corridor of Koala preferred food
                                                trees is retained to allow safe passage for the Koala out of the work zone.
                                            o   Clearing cannot resume within the buffer area until the Koala has self-
                                                relocated to an adequate distance.
                                   After works:
                                       •    All impact management strategies implemented and their relative success at
                                            mitigating risks to fauna are to be reported on.

            Performance                1. Zero disturbance must occur outside the permitted clearing area.
            indicators                 2. Mortality and disturbance of fauna should be prevented.
                                       3. Suitable habitat within areas not scheduled for clearing remain functional and
                                          stable ecosystems.

            Personnel              Base Architecture is held accountable for:
            responsible
                                        •   Ensuring all relevant permits have been approved prior to commencing works.
                                        •   Ensuring all contractors are able to comply with this management plan.
                                        •   Ensuring habitat connectivity is maintained through corridors of retained
                                            vegetation.
                                        •   Ensuring a suitably qualified FSC undertakes a Pre-Clearance survey to identify
                                            habitat features and reduce fauna load prior to clearing within two [2] weeks of
                                            clearing.
                                        •   Ensuring a suitably qualified FSC is present for all vegetation clearing.
                                   The Clearing Contractor is responsible for conducting vegetation clearing in
                                   accordance with this management plan.
                                   The FSC / Ecologist is responsible for:
                                        •   Undertaking a thorough Pre-clearance survey, safely capturing fauna and
                                            releasing fauna into suitable habitat and under suitable conditions.
                                        •   Maintaining detailed records of fauna interactions and fauna habitat cleared, as
                                            well as preparing reports.
                                   All personnel are responsible for upholding animal welfare by preventing and / or
                                   minimizing the risk of distress, injury, illness, orphanage, predation, or death of fauna.

            Reporting and          The FSC / Ecologist is responsible for:
            auditing
                                       •    Reporting on the number of hollows, hollow recruitment trees and arboreal
                                            termitaries lost as a result of clearing works.
                                       •    Providing a Pre-Clearance Report, detailing all habitat features and/or breeding
                                            places in the clearing area.
                                       •    Providing a Post-Clearance Report, detailing the clearing of any native
                                            vegetation, including any fauna found and or relocated, and the details of all
                                            habitat features removed during works.
                                       •    Maintaining fauna interactions and breeding place registers, to be submitted to
                                            Base Architecture.
                                   Base Architecture is responsible for providing the fauna interaction register, breeding
                                   place register and Post-Clearance Report to DES within 6 months of works
                                   commencing.



           FAUNA MANAGEMENT PLAN | Summit Road, Pomona
                                                                                                                                18


Document Set ID: 22570982
Version: 1, Version Date: 05/09/2023
Log in to download the original file

SUPERSEDED - Approved Plan - OPW23_0084.pdf · 9.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.