Original source · versioned page text
2021-04-06 Planning & Environment Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 APRIL 2021
47.6. Stormwater detention must be included in the stormwater treatment train design,
and maintained to facilitate for stormwater flows discharging from the development
to be consistent with pre-development characteristics.
47.7. Stormwater discharges are provided with a free draining outlet and connect to a
lawful point of discharge in accordance with PSP6 Engineering Design Standards
- Roads, drainage and earthworks
48. All stormwater quality treatment devices must be maintained in accordance with the
Water by Design (2012) - Maintaining Vegetated Stormwater Assets (Version 1). A copy
of this document must be retained on the site together with the approved Operational
Works drawings for the stormwater quality treatment system and a detailed life cycle
costing of the system attached as an addendum. Records of all maintenance activities
undertaken must be kept and made available to Council upon request.
49. Any proposed Community Management Statement required for the development must
include the Water by Design (2012) – Maintaining Vegetated Stormwater Assets (Version
1) document and must include the full cost of maintaining the system in accordance with
that document.
Construction Traffic Management Plan
50. A Construction Management Plan must be submitted with the Operational Works
application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction
ii. maintenance of safe pedestrian access for the areas affected by the works
during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of the
development
iv. approval of the Traffic Management Control Plan by the Department of
Transport and Main Roads (DTMR) for any works on State controlled roads
v. provision for worker car parking
b. maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures
c. works programme identifying key components of the works and their respective
durations
d. establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed construction
times, impacts on traffic, services and other relevant issues.
e. Include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details.
f. Include signage in prominent locations on the boundaries of the site advising of the
proposed development, the expected time frames and the site contact details.
g. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
Page 11 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.