42. All earthworks and associated retaining structures/batters/anchors must be contained
entirely within the subject site unless written permission from the respective landowner(s)
is provided to Council. All earthworks must be undertaken in accordance with the
provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial
and Residential Developments.
43. Where the development involves excavation or filling over, or adjacent to, drainage,
water supply or sewerage infrastructure, all access chamber surface levels must be
adjusted to provide a freeboard of 100mm above the finished ground surface level.
44. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Damage to Services and Assets
45. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Stormwater Quality
46. The development must include a stormwater quality treatment system designed to
achieve 80% reduction in Total Suspended Solids, 60% reduction in Total Phosphorous,
and 45% reduction in Total Nitrogen compared to an unmitigated scenario, prior to
discharge from the site.
47. The stormwater quality treatment system must be in accordance with an Operational
Works approval for stormwater drainage and, the Queensland Urban Drainage Manual.
The application for Operational Works Approval must demonstrate that:
47.1. all runoff can be filtered via vegetated areas prior to discharge from the site.
47.2. pollutant reduction predicted for the stormwater quality treatment train is designed
in accordance with the Water by Design MUSIC modelling guidelines (Version 1)
2010.
47.3. Detail design plans for the stormwater treatment train, and submitted for the
Operational Works approval, demonstrate the size of water quality improvement
features are consistent with the MUSIC model, and are visually integrated into the
development in accordance with the Water by Design Bio-retention Technical
Design guidelines (Version 1.1) October 2014.
47.4. Any necessary retaining walls within bio retention basins must not exceed 0.8m in
height. The operational works approval application must detail proposed rock
finishing on any retaining walls, and these approved finishes shall be maintained
for the life of the development. Raw finished concrete block retaining walls will not
be approved.
47.5. The application for operational works approval must include the design for
educational signage to be included within/alongside the bio-retention basin.
Signage must follow a green and white colour pallet and state “This bio retention
basin cleans stormwater runoff prior to its discharge to The Noosa River”.
Page 10 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.