Communal Recreation Area/s
25. Communal recreation area/s must be provided as shown on the approved plans.
Safety and Security
26. All external lighting at entrances, pathways, emergency exits and other external locations
must not result in light shed beyond the boundaries of the site and design and/or
screened where necessary to prevent glare and light disturbance to neighbouring
properties.
27. Individual unit numbers must be clearly signed.
28. All pathways and land used for outdoor recreation must have grades not exceeding 1 in
20, with paths having hard, slip resistant surfaces.
Site Access and Driveways
29. A sealed access driveway must be provided from Viewland Drive to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
a. a driveway crossover generally in accordance with Council Standard Drawing RS-
051
b. suitable safety measures to improve driver awareness of pedestrians and enhance
pedestrian safety.
Car Parking
30. A minimum of six (6) car parking spaces must be provided and marked on the site and
made available and accessible at all times. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
a. 3 visitor parking spaces within the total, which are clearly marked for that purpose
and accessible at all times for visitor use
b. 2 staff parking spaces within the total, which are clearly marked for that purpose
c. 1 disabled parking space/s within the total
d. 1 emergency vehicle bay within the total
e. dimensions, crossfalls and gradients in accordance with Australian Standards
AS/NZS2890.1:2004 and AS/NZS2890.6:2009
31. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
32. Directional signage must be provided to direct visitors to the car parking spaces provided
on site.
Stormwater Drainage
33. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and be generally in accordance with drawing number Q20-004-C01
Revision F titled Stormwater Drainage Layout Plan prepared by Neil McKenzie and
Associates Pty Ltd dated 11 March 2021. The operational works application must include
but not be limited to:
a. Certification from the Geotechnical Engineer that supports the design and makes
specific comment regarding the proposed on-site infiltration system and the swale
drain
Page 8 of 52
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.