PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    6 APRIL 2021


          b.   Certification that states that if the works are carried out in accordance with the
               design plans the development of the site will not create a stormwater worsening
               on the adjoining downstream properties
          This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
          infrastructure.
          Services
    34.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    35.   Certification must be submitted to Council from all relevant service providers (Energex,
          NBN and Unitywater) which certifies that the development has met the requirements of
          this Decision Notice and all applicable legislation at the time of construction.
          Easements
    36.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    37.   All easements must be designed in accordance with the planning scheme and granted
          at no cost to the Grantee. Where the Grantee is Council or a service authority, the
          easement documentation must be in accordance with the Grantee’s standard easement
          terms. Draft easement documentation must be submitted to Council for endorsement.
    38.   All works must be kept clear of any existing or proposed easements on the subject land,
          unless agreed otherwise in writing by the Grantee.
          Geotechnical Stability
    39.   All works must be carried out generally in accordance with the recommendations
          contained in the Report on Geotechnical Investigation – Project Number 95141.00
          prepared by Douglas Partners dated January 2021 with the following additions:
          a.   The report must be amended to include specific reference to the proposed on-site
               infiltration system and the proposed swale drain;
          b.   Certification that states that if the works are carried out in accordance with the
               report the development of the site will not:
               a.    adversely impact on the stability of the subject site or
               b.    adversely impact on the stability of any adjoining land and/or structure
                     erected on the adjoining land
          The report incorporating the above amendments must be resubmitted to Council as part
          of any subsequent Development Permit for Operational Works*.
          *(Refer to Advisory Note)
    40.   Prior to the commencement of the use certification must be submitted to Council from a
          qualified person* which certifies that the development has been constructed in
          accordance with the approved Geotechnical Report for the development and that the
          development will remain stable in the long term.
          *(Refer to advisory Note)
          Earthworks and Retaining Walls
    41.   All earthworks must be undertaken in accordance with an Operational Works approval,
          and contained entirely within the subject site unless written permission from the
          respective landowner(s) is provided to Council.

                                                                                    Page 9 of 52
Log in to download the original file

2021-04-06 Planning & Environment Committee Meeting Agenda(PDF, 8MB).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.