Original source · versioned page text
Part C - Attachments E to G
Attached to the e-mail Other Change Application – 132002.220285.5.
The original of this document is very large (15.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 25, section 1. The text section number identifies this passage in the reader.
318 [OCR of page images] NOOSA COUNCIL IDAS Development Application Decision Notice 24 173.3. 173.4. 173.5. 173.6. 173.7. 173.8. 173.9. 173.10. 173.11. 173.12. 173.13. 173.14. 173.15. 173.16. All primary treatment of runoff will be outside the open space area OS7 to ensure compliance with MP2; Deleted. The bio-retention areas within the car parks must be large enough to allow the proposed planting to thrive and have a viable root system; The detailed design of the stormwater management system shall provide for water reuse within the site so as to ensure that the hydrology of the open space areas is maintained while using a reasonable quantity of excess water generated by the development within the site for non-potable purposes such as landscape watering generally in accordance with the Concept Stormwater Management Plan to the reasonable satisfaction of the Manager - Land Development. More detailed analysis using MUSIC or equivalent suitable software is required to refine the water reuse assessments as well as pollution management measures, with a one hour (maximum) time step to be used; Deleted. The Site Rehabilitation Plan shall provide details about the revegetation of water quality control devices located in the OS7 area and the Landscape Plan shall provide details about the vegetation of water quality control devices in the developed precincts. The Stormwater Management Plan shall demonstrate that the proposed vegetation on the water quality control devices will adequately treat the stormwater and achieve the required water quality. Deleted. Deleted. Deleted. Operational works stormwater management planning is to be included; Deleted. Deleted. Details of the sediment and erosion control for construction management for the development that adequately addresses the extent of site disturbance proposed; The establishment and operational phases for the project, including at least four per year event based water quality monitoring as detailed in the draft concept Stormwater Management Plan dated 19 June 2003, within the gullies of the site, and in the receiving waters for: . Total Nitrogen. ° Total Phosphorus. . Suspended Solids & Turbidity. ° pH. . Salinity. . Temperature. ° Trash & gross pollutants. ° Algal count and identification. e Faecal coliforms. The applicant shall continue monitoring for a period of 5 years from completion of Stage 1. The results of monitoring are to be submitted to Council in a digital form acceptable to the Manager Land Development. A ordatabase\anestop\decision.dac 318
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.