Part C - Attachments E to G

Attached to the e-mail Other Change Application – 132002.220285.5.

of 69

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 25, section 1. The text section number identifies this passage in the reader.

318


[OCR of page images]
NOOSA COUNCIL IDAS Development Application Decision Notice 24

173.3.

173.4.

173.5.

173.6.

173.7.

173.8.

173.9.

173.10.
173.11.
173.12.
173.13.
173.14.

173.15.

173.16.

All primary treatment of runoff will be outside the open space area OS7 to ensure
compliance with MP2;

Deleted.

The bio-retention areas within the car parks must be large enough to allow the proposed
planting to thrive and have a viable root system;

The detailed design of the stormwater management system shall provide for water reuse
within the site so as to ensure that the hydrology of the open space areas is maintained
while using a reasonable quantity of excess water generated by the development within the
site for non-potable purposes such as landscape watering generally in accordance with the
Concept Stormwater Management Plan to the reasonable satisfaction of the Manager -
Land Development. More detailed analysis using MUSIC or equivalent suitable software is
required to refine the water reuse assessments as well as pollution management
measures, with a one hour (maximum) time step to be used;

Deleted.

The Site Rehabilitation Plan shall provide details about the revegetation of water quality
control devices located in the OS7 area and the Landscape Plan shall provide details about
the vegetation of water quality control devices in the developed precincts. The Stormwater
Management Plan shall demonstrate that the proposed vegetation on the water quality
control devices will adequately treat the stormwater and achieve the required water quality.

Deleted.
Deleted.
Deleted.
Operational works stormwater management planning is to be included;
Deleted.
Deleted.

Details of the sediment and erosion control for construction management for the
development that adequately addresses the extent of site disturbance proposed;

The establishment and operational phases for the project, including at least four per year
event based water quality monitoring as detailed in the draft concept Stormwater
Management Plan dated 19 June 2003, within the gullies of the site, and in the receiving
waters for:

. Total Nitrogen.

° Total Phosphorus.

. Suspended Solids & Turbidity.
° pH.

. Salinity.

. Temperature.

° Trash & gross pollutants.

° Algal count and identification.

e Faecal coliforms.

The applicant shall continue monitoring for a period of 5 years from completion of Stage 1.
The results of monitoring are to be submitted to Council in a digital form acceptable to the
Manager Land Development.

A ordatabase\anestop\decision.dac

318

 

 
Log in to download the original file

Part C - Attachments E to G.PDF · 15.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.