Part C - Attachments E to G

Attached to the e-mail Other Change Application – 132002.220285.5.

of 69

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 28, section 1. The text section number identifies this passage in the reader.

321


[OCR of page images]
NOOSA COUNCIL IDAS Development Application Decision Notice 27

188.
189.
190.

191.

192.

193.

194,

195.

196.

197.

198.

199.

200.

Deleted
Deleted.
Deleted.

A registered practicing Geotechnical Engineer shall test the existing ground conditions for suitability of
placing additional fill prior to such fill being placed. Batters within the loop road reserve shall be at a
maximum grade of 1:4 unless retained by a wall. In all other areas batters will have a maximum batter
as determined by a registered practicing Geotechnical Engineer in consultation with Manager Land
Development. Landscape treatment of the batters will be a consideration in their agreed slope.

Fill shall be compacted to 95% relative dry density as per Main Roads Department Test No. Q8A. A
registered practicing Geotechnical Engineer shall supervise all the placement of fill and shall certify
that all lots have been compacted to the required standard.

Any existing fillon the site that-does not comply with Council’s requirements shall be removed at the
direction of the Manager Land Development prior to additional filling works commencing.

Following completion of the filling works, the registered practicing Geotechnical Engineer supervising
the works shall submit compaction tests across the entire filled areas and a site classification report
for each lot subject to filling. The extent of fill and each lot site classification shall be shown on a
metes and bounds survey plan.

Acid Sulfate Soils

Where excavations are proposed below R.L 5.0m AHD a report shall be submitted from a suitably
qualified person in conjunction with an application for development permit for operational works
(earthworks), to determine if acid sulfate soils are present on site. If acid sulfate soils are present on
site the report shall also outline the required treatment and management of the disturbed soils in
accordance with the requirements of State Planning Policy 2/02 'Planning and managing development
involving acid sulfate soils’.

Erosion & Sediment Control

To protect the environment against siltation/sediment export or soil erosion as a result of this
development, an erosion and sediment control plan shall be submitted in conjunction with an
application for a development permit for operational works (earthworks). Site control measures such
as silt fencing, controlled gravel access to the site and controlled disposal of waste, may be
necessary. Prior to commencement of building works, all physical site contro! measures shall be
installed, and the plan adhered to.

Town Water Supply

The applicant will construct at its cost a second feed in conjunction with the construction of the Walter
Hay Drive access if the anticipated loading on the system for the ultimate development exceeds the
equivalent of 35 tenements.

Sizes of the mains are to be a minimum of 150mm diameter and are to be confirmed by a network
analysis carried out by Councils consultants at the applicants cost.

A water supply master plan for ultimate development shall be to the satisfaction of the Manager - Land
Development and shall be submitted in conjunction with an application for operational works (water
supply). The Water Supply Master Plan will consider metering of individual occupancies and common
(body corporate) flows as well as the reticulation system and valving arrangements. All water
infrastructure will be designed and constructed in accordance with the approved Water Supply Master
Plan.

Sewer Capacity

The applicant at its costs will construct the proposed sewer rising main in the development to
discharge to Manhole NV40/01/18 in Eenie Creek Road.

The existing sewer pump station and rising main are to be upgraded by the applicant to the standards
and requirements as detailed in Councils Engineering Design Manual - Water & Sewerage.

A o\database\onestop\decision.doc

321

 

 
Log in to download the original file

Part C - Attachments E to G.PDF · 15.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.