Part C - Attachments E to G

Attached to the e-mail Other Change Application – 132002.220285.5.

of 69

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 29, section 1. The text section number identifies this passage in the reader.

322


[OCR of page images]
NOOSA COUNCIL IDAS Development Application Decision Notice 28

201.

202.

203.

204.

205.

206.

207.

208,
209.

210.

211.

212.

A Sewer Master Plan for ultimate development shall be submitted to the reasonable satisfaction of the
Manager Land Development in conjunction with an application for a development permit for
operational works (sewer works).. All sewer infrastructure will be designed and constructed in
accordance with the approved Sewer Master Plan.

All internal reticulation works (both water and sewerage) are to be constructed in accordance with
Noosa Council Engineering Standards for Water and Sewerage (depending on tenure may be
classified as private main when completed) and checked by Council with full as constructed
requirements as per Council standards.

Service Easements

All infrastructure shall be covered by easements where necessary to the reasonable satisfaction of the
Manager Land Development.

No building or other structure shall be constructed or encroach over an easement. Any building or
structure within proximity of an easement of Council's or any other public utility's underground
infrastructure must have its foundations designed so that no surcharge loads are imposed upon such
underground infrastructure. Foundations must be taken down a minimum of 1m below a line of
influence measured 1m in the direction of the foundation from the centreline of the closest
underground service and along the natural angle of repose of the foundation soil type(s).

Headworks

Headworks contributions are required for Water Supply and Sewerage and will be charged in
accordance with Council's Planning Policies, PSP 28 - Water Supply Headworks Contributions and
PSP30 - Sewerage Headworks Contributions. These headworks are to be paid by the applicant prior
to the issue of a Development Permit for Building Works. An estimate only of the expected
contribution is:-

Retail Centre $466,608.00
Showroom & Commercial/Business $260,340.00

TOTAL $726,948.00
General

Prior to undertaking any excavation, the person acting on this permit shall contact public utility service
providers to ascertain the location of their underground services.

The applicant shall sign a written undertaking to be responsible for the full cost of repairs to road
pavement, footpath, kerb and gutter, or other Council property and facilities damaged as a result of
construction of the proposed development.

Where kerb and channel is constructed at a road intersection or any other place it is provided,
disabled access shall be incorporated.

No Council property or facility shall be interfered with during works associated with this development
without Council approval.

A Traffic Management Plan is to be prepared by a Registered Professional Engineer of Queensland
addressing safety during construction, including pedestrian safety, in accordance with the Manual of
Uniform Traffic Control Devices and Department of Transport (Main Roads Division) Roadworks
Signing Guide. A copy of which is to be submitted to Council for their records prior to construction
commencing.

All designs for engineering works involving the construction of pavements, kerb and channel, vehicular
access, footpaths, turnouts, stormwater drainage, water supply or sewerage reticulation shall be
prepared in accordance with the requirements of Council's Engineering Design Standards, shall
reference where applicable to Council's Standard Drawings and shall incorporate best engineering
practice,

A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works, which shall be submitted in conjunction with an application for
a development permit for operational works.

A o‘\database'onesiopidecision.doc

322

 

 
Log in to download the original file

Part C - Attachments E to G.PDF · 15.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.