Skip to the record
Search everything, all in one place.

Council archive · source document

proposal plans · 51996.2028.01

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                   deck below                                                                                                                                                                  new roof over L1 deck /
                                                                                                                                                                                                                                                                                                                                                                                          ex.dp + new
                                                                                                                                                                                                                                                                                                               shr extension below                                                        dp(tbc)
                                                                                                                                                                                                                                                                                                                                                  ex.gutter to remain




                                                                                                                                                                                  new p.c steel                                                                                                                                                                                                                        new p.c steel
                                                                                                                                                                                  outriggers to this roof                                                                                                                                                                                                              outriggers to this roof

                                                                                                                                                                                                                                               exist. 5° fall


                                                                                         pool below                                                                                                                                             new custom orb (colourbond finish) roof                                                                                                                                new clear glass to replace exist. glass
                                                                                                                                                                                                                                                sheeting to this roof only - all new                                                                                                                                   to balustrade - new p.c. 'black' satin
                                                                                                                                                                                                                                                colourbond flashing to replace exist.                                                                                                                                  finish to handrail / uprights




                                                                                                                                                                                                                                                                                                                                                                                           fall
                                                                                                                                                                                                                           exist. 6° fall
                                                                                                   ex.shs - new paint                                                                                                                                                                           exist. skylights to remain - new apron                                                                                 new waterproofing membrane to all flat
                                                                                                   finish - typ. to all                                                                                                                                                                         flashing to suit                                                                                                       roof areas & under new external tiles -
                                                                                                                                                                                                                                                new s/steel flue - installation                                                                                                                                        make good any damaged areas - req'd
                                                                                                    new frameless glass balustrade on
                                                                                                                                                                                                                                                to NCC 3.7.3 req'ts                                                                                                                                                    falls min1:100 - colour to match new roof
                                                                                                    spigots to match exist. - minimal s/s
                                                                                                                                                                                                                                                                                                                                                                                                                       sheeting (to be confirmed on site)
                                                                                                    channel handrail to top - min.1m h                                                                line of exist. roof over                                                       new flue

                                                                                                              deck 6                                                                                                   fixed glazing to        nom.50mm step up to shower area for                                                                deck 5
                                                                                                            new h/wd decking (incl.                                                                                    replace exist.          falls (if possible modify joists under to                                                         new external tiles
                                                                                                            new structure under)                                                                      ex.dp                                    have no step) frameless shower screen
                                                                                            exist.doors                                                                                                exist.win.                            exist.win.   exist.win.    exist.win.              exist.win.                                                         exist.doors
                                                                                                                                                                                                                        W.01
                                                                                                new ceiling mounted curtain                                                                                                                                                                                                       new ceiling mounted curtain
                                                                            exist.win.                                                          exist.win.
                                                                                                                                                                                                                         L3                                 void                                                                  track - new curtains (sheer &
                                                                                                track - new curtains (sheer &
                                                                                                block out) by others                                                                                                                                                                                                              block out) by others




                                                                                                                                                                                                                                                                                                             exist.shutters
                                                                                                                                                                                                                                               new wc / japanese toilet
                                                                                                                                                                                                                                               seat (in- wall cistern)                                                                         study                 ex. f.f.l. 35.6
                                                                                                             bed 1                                                   min° fall           exist.win.                                                                                      8                                              ex.timber (refinished)
                                                                                                          ex.timber (refinished)                                                                                                                          void                                                                exist. timber stair (refinished) - typ. to all




                                                                                                                                                                                                                                                                                                                                                                                                      fall
                                                                                                          ex. f.f.l. 35.6
                                                                                                                                                                                                  bath 2                                       freestanding bath                                         9
                                                                               exist.win.                                                                                                         new tiles                                                                                                                   new door position
                                                                                                                                                                                                                                               (shown 1680 x 925) - wall
                                                                                                                                                                                                                                                                                                                                     new p'bd bed head shelf with 820 cs (door




                                                                                                                                                                                                                                                                                                                     820
                                                                                                                                                                                                                                               mounted mixer / spout on


                                                                                                                                                                                                              exist.
                                                                                                                                                                                                                                                                                                                                     solid timber shelf as spec   opening                         exist.win.
                                                                                                                                                                                                                                               1100h vanity wall
                                                                                                                                                                                         exist.win.
                                                                                                                                                                                                                                                                                         1
                                                                                                                                                                                                                                                                                                                                                                           modified)
                                          1000h drawers to wir side                                                                                                                                                                                                                                     15                                                                                                             nom.50mm step up to
                                          with bed head shelf to detail -                                                                                                                                                                                                                                                                                                                                      ex.dp   shower area for falls -
                                          open over                               exist.win.                                                                 exist.win.                                                                                                                                                                                                                                                frameless shower screen
                                                                                                                                  wir                                                                                                                       walkway ex.timber (refinished)
                                          new robe cup'ds - mix of full
                                                                                                              ex.timber (refinished)                                                                                                                                                                                                                          robe               bath 3                                new wc (in-wall cistern)
                                                                                                                                                                                                                                                                       ain                                                                                                       new tiles
                                          ht hanging / 21 hanging /                                                                                                                                                                               glass below - to rem                                                                                                                                                 to replace exist.
                                          shelves / shoe shelves                                                                                                                                                                                                                                                                                                                  exist.win.

                                                                                 ex.dp                                                                                                                                                                                                                                                                                              new wall hung vanity bench with
                                                                                                                                                                                                                                            exist. s/steel balustrade                                                          new fitout for robe
                                                                                                                                                                                                                                            (re-polish / make good)                                                                                                                 drawers under, wall mixer / spout
                                                                                                                                                                           new p.c alum (white) louvred
                                                                                                                                                                           retractable roof structure over                                                                                                                    exist. s/steel balustrade (re-polish
                                                                                                                                                                           L2 outdoor dining area -                                                                                                                           / make good) with new paint finish
                                                                                                                                                                                                                                            new wall hung vanity bench on 21                                                                                                        typ. new wall & floor tiles to all
                                                                                                                                                                           mounted at floor level of L3                                                                                                                       to exist. steel stringer ( 'black'
                                                                                                                                                                                                                                            vanity shelf - mirrored shaving                                                                                                         bathrooms - 2100 wall tiles to shr / 1100
                                                                                                                                                                                                                                                                                                                              satin as spec.)
                                                                                                                                                                                                                                            cup'ds over, wall mixer / spout                                                                                                         h wall tiles to all other walls uno




                                                                                                                                                                                                                             nb:
                                                                                                                                                                                                                             - typ. to all - exist. flashings to windows / roof areas to be treated & refinished as
                                                                            01            LEVEL 3 FLOOR PLAN (Roof Plan Level 2)                                                                                             spec. where req'd (unless noted to be replaced)
                                                                                                                                                                                                                             - all roof screws to be checked / installed correctly - perpendicular to the sheeting in                                                    walls / fixtures to be demolished - make good where req'd
                                                                            -             1:100@A3 / 1:50@A1                                                                                                                 the middle of the rib for maximum water tightness
                                                                                                                                                                                                                                                                                                                                                                         typ. 90mm internal stud wall - u.n.o.
                                                                                            0              1.0                          2.0                       5.0m                                        note:
                                                                                                                                                                                                                -             all external / internal walls to be patched / made good where required                                                                     existing wall/s to remain (make good as req'd)
                                                                                                                                                                                                                              prior to new paint finish as spec.
                                                                                                                                                                                                                                                                                                                                                                                                                                        01          ENGINEERING & CERTIFICATION ISSUE   19.05.2020
                                                                                                                                                                                                                                                                                                                                                                                                                                        Issue        Amendment                          Date
                                                                                                             bsa lic.no.1071865




The design & drawings shown on these                                                                                               PROJECT                                                                                                                                                        DRAWING TITLE                                                                                                                         SCALE                         DWG No.           ISSUE
                                                                                                                                                                                                                                                                                                                                                                                                                                           1:100@A3 / 1:50@A1
plans are copyrighted and remain the                                                                                                Alterations & Extensions for Goetz Maeuser & Louise Biddell                                                                                                  Proposed LEVEL 3 FLOOR PLAN
property of 'georgina price design'. No
unauthorised copies shall be made.                                                                                                  8/27 Ross Crescent, Sunshine Beach Q                                                                                                                                                                                                                                                                DATE
                                                                                                                                                                                                                                                                                                                                                                                                                                             May 2020
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        A.08             01

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

proposal plans.pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.