Skip to the record
For the highest quality transcripts.

Council archive · source document

proposal plans · 51996.2028.01

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                 refer to Level 3 Floor Plan for
                                                                                                                                                                 details of roof works to this roof




                                                                                                                                                                                                                 new s/steel flue - installation
                                                                                                                                                                                                                 to NCC 3.7.3 req'ts
                                                                                                                                                       ex.gutter to remain                                                                         new flue

                                                                                                                                               20°
                                                                                                                                               fall




                                                                                                                                                                                     exist. steel outriggers to this
                                                                                                                                                                                     roof to remain - to be patched /                          exist. custom orb roof
                                                                                                                                                                                     treated & refinished as spec.                             sheeting to remain to this
                                                                                                     exist.
                                                                                                    10° fall




                                                                                                                                                                                                                                               roof - exist. solar pool                                                                                      exist. steel outriggers to this




                                                                                                                                                                                                                            20° fall




                                                                                                                                                                                                                                                                                                    20° fall
                                                                                                                                                                                                                            exist.




                                                                                                                                                                                                                                                                                                    exist.
                                                                                                                                                                                                                                               heating system to remain                                                                                      roof to remain - to be patched /
                                                                                                                                                                                                                                                                                                                                                             treated & refinished as spec.
                                                                                                                                                                                     exist. wall capping under - to be
                                                                                                                                                                                     repaired / replaced if needed - cos




                                                                                                  min.1:100
                                                                                                  fall                                                                                                                                                                                                                                                      exist. roof sheeting / outriggers to remain - steel




                                                                                                                                                                                                                                                                                                                                20°
                                                                                                                                                                                                                                                                                                                                                            outriggers to be patched, treated & refinished as spec.




                                                                                                                                                                                                                                                                                                                                fall
                                                                                                    20°
                                                                                                    fall




                                                                                                                                                                                                                                                                                                                                20°
                                                                                                                                                                                                                                                                                                                                fall
                                                                                                                                                                                                                                                                                                                                                            new roofing to higher section roof (replaced with
                                   exist. box gutter to be rectified / make good           exist. roof sheeting                                                                       ex.gutter to remain                                                                                                                                                   exist. roof sheets that have been removed from
                                                                                                                                                    p.c alum louvred                                                                                                                                                                                        L2 roof (only if suitable / in good condition) -
                                   where water damage - new structure where                to remain                                                                                 exist. steel purlin/s under higher                 higher section roof to be removed
                                                                                                                                                    retractable roof                                                                                                                        exist. box gutter under - to                                    steel purlins under to be patched, treated &
                                   required / new waterproof membrane with                                                                                                           section roof to be replaced                        (replaced with exist. roof sheets that
                                                                                                                                                    structure below - over                                                                                                                  be rectified due to exist.                                      refinished as spec.
                                   new falls req'd min.1:100                                                                                                                                                                            have been removed from L2 roof (only
                                                                                                                                                    Level 2 outdoor dining                                                                                                                  water damage / make good
                                                                                                                                                                                                                                        if suitable / in good condition)



                                                                                                                                                                                                                                                                                                                                                                                   new solar panels / option only for costings - to be
                                                                                                                                                                                                                                                                                                                                                                                   confirmed - option to have approx. 16 panels (3kW
                                                                                                                                                                                                                                                                                                                                                                                   system on upper level roof & roof over bed 1

                                                                                                                                                                                       nb:
                                                                           01      ROOF PLAN                                                                                           - typ. to all - exist. flashings to windows / roof areas to be treated & refinished as
                                                                                                                                                                                                                                                                                                                walls / fixtures to be demolished - make good where req'd
                                                                                                                                                                                       spec. where req'd (unless noted to be replaced)                                                                          typ. 90mm internal stud wall - u.n.o.
                                                                           -       1:100@A3 / 1:50@A1
                                                                                                                                                                                       - all roof screws to be checked / installed correctly - perpendicular to the sheeting in
                                                                                   0
                                                                                                                                                                                                                                                                                                                existing wall/s to remain (make good as req'd)
                                                                                            1.0          2.0                                 5.0m                                      the middle of the rib for maximum water tightness

                                                                                                                                                                                                                                                                                                                                                                                   01           ENGINEERING & CERTIFICATION ISSUE        19.05.2020
                                                                                                                                                                                                                                                                                                                                                                                    Issue       Amendment                                Date
                                                                                                           bsa lic.no.1071865




The design & drawings shown on these                                                                                            PROJECT                                                                                                                                     DRAWING TITLE                                                                                          SCALE                                  DWG No.        ISSUE
                                                                                                                                                                                                                                                                                                                                                                                      1:100@A3 / 1:50@A1
plans are copyrighted and remain the                                                                                             Alterations & Extensions for Goetz Maeuser & Louise Biddell                                                                                Proposed ROOF PLAN
property of 'georgina price design'. No
unauthorised copies shall be made.                                                                                               8/27 Ross Crescent, Sunshine Beach Q                                                                                                                                                                                                              DATE
                                                                                                                                                                                                                                                                                                                                                                                        May 2020
                                                                                                                                                                                                                                                                                                                                                                                                                            A.09          01

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

proposal plans.pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.