Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2022-05-16 General Committee Meeting Agenda

of 96

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                      16 MAY 2022


   RECOMMENDATION
   That Council note the report by the Development Planner to the General Committee Meeting
   dated 16 May 2022 regarding Application No. MCU21/0151 for a Development Permit for
   Material Change of Use - Telecommunications Facility situated at 25 Railway Pde Pomona
   and:
   A.   Approve the application in accordance with the following conditions:
        When Conditions Must Be Complied With
        1.      Unless otherwise stated, all works required by the conditions of this Decision
                Notice must be completed prior to the use commencing, and then compliance
                maintained at all times while the use continues.
        Approved Plans
        2.      Development undertaken in accordance with this approval must generally comply
                with the approved plans of development. The approved plans are listed in the
                following table unless otherwise amended by these conditions.

             Plan No.     Sheet    Plan/Document Name                                    Date
                          No.
             QC100259     S0       Site specific notes, prepared by Telstra              18.06.2021
             QC100259     S1       Site Layout and Access, prepared by Telstra           18.06.2021
             QC100259     S1-1     Site Layout, prepared by Telstra                      18.06.2021
             QC100259     S1-2     Site Setout Plan – Option 1, prepared by Telstra      18.06.2021
             QC100259     S3       East Elevation, prepared by Telstra                   18.06.2021
             QC100259     G4       Site Earthing – Option 1, prepared by Telstra         18.06.2021
             QC100259     G4-1     Earthing Scenario 3, prepared by Telstra              18.06.2021
             QC100259     G4-4     Trench Details, prepared by Telstra                   18.06.2021
             QC100259     E2       AC Power Connection, prepared by Telstra              18.06.2021
             QC100259     T2       Concrete Foundation Details, prepared by Telstra      18.06.2021
             QC100259     T2-1     Equipment Platform – H Frame Detail, prepared by      18.06.2021
                                   Telstra
             QC100259     T8       Compound Fence and Gate Details, prepared by          18.06.2021
                                   Telstra (as annotated by Council)
             501-PL       A        Landscape Concept Plan, prepared by Urbis             21.12.2021
        Nature and Extent of Approved Use
        3.      The maximum height of the satellite dish must not exceed the maximum height
                as reflected in the approved plans with respect with the finished ground level and
                the natural ground level.
        4.      No lights are permitted to be attached to the telecommunications facility, except
                where required for hazard lighting purposes or similar.
        Currency Period
        5.      The Currency Period for this development approval lapses if the use has not
                happened by 19 May 2028, unless an application to extend the currency period
                is approved by Council.
        Health and Safety
        6.      The development must not, at any time during the life of the development, result

                                                                                      Page 17 of 96
Log in to download the original file

2022-05-16 General Committee Meeting Agenda(PDF, 18MB).pdf · 18.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.