Original source · versioned page text
2022-05-16 General Committee Meeting Agenda
The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
in human exposure to environmental electromagnetic emissions exceeding the
current regulations, standards and/or recommendations of the Australian
Radiation Protection and Nuclear Safety Agency (ARPANSA). The carrier of the
infrastructure must provide, at any time upon request by Council, written
certification to demonstrate compliance with this condition. The written
certification must assume:
a. a maximum number of users over the lifetime of the structure;
b. full power usage;
c. a maximum down tilt of antennae.
Colours and Finishes
7. The development must be finished in pale eucalypt or the like in order to visually
blend into the landscape.
8. Associated fencing (and gate) as shown on the approved plans must be visually
unobtrusive and must be camouflaged through the use of colours, materials and
screening vegetation to blend the fence into the visual landscape.
Site maintenance
9. The site must be kept tidy and well maintained at all times for the life of the
development.
Cessation of Use
10. The facility must be removed from the site upon cessation of the use.
Noise
11. Written certification is required from a suitably qualified person confirming that
sound pressure levels from all mechanical plant and equipment comply with the
following:
a. Air-conditioning and equipment
7am to 10pm: Maximum level allowable = background + 5dB(A)
10pm to 7am: Maximum level allowable = background + 3dB(A)
12. The certification must be submitted to Council, which certifies that operational
noise from any fixed plant and equipment complies with the requirements of this
Decision Notice.
Vegetation Retention
13. Existing trees on the site must be retained, except where required to be removed
to accommodate the approved use.
14. Existing vegetation in the road reserve must be retained, unless written
authorisation from Council is granted for the clearing.
Landscaping Works
15. The development site must be landscaped generally in accordance with the
approved plans and include additional landscaping to enhance the amenity of the
site. The works must be undertaken in accordance with an Operational Works
approval and the Noosa Plan and Planning Scheme Policy PSP2 - Landscaping
for the Pomona area and must include in particular:
a. the works shown on the approved Landscape Concept Plan, and in addition
include the following:
i. 1 x 45L pot size street tree per 8m of road frontage (minimum 7
Page 18 of 96
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.