Original source · versioned page text
2022-05-16 General Committee Meeting Agenda
The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Figure 5 – Elevations
2. SITE DETAILS
2.1. Background
The site is currently used as a telecommunication facility and has been operational since
before 1990. The facility has existing use rights to operate as such.
Council’s records indicate that building approval was obtained on 19 February 1991 for the
existing exchange building. The site plan provided with that application was annotated
identifying the demountable building was the former exchange building and would be
removed once the new exchange building was constructed. Refer Figure 6 – site plan for
exchange building. This structure was never removed. It is also noted that no building
approval for this structure can be found through Council’s Building Department.
Figure 6 – site plan for exchange building
It is therefore recommended that the applicant be advised to remove the demountable
building or obtain the relevant building approvals within 90 days of the date of the approval.
Page 22 of 96
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.