Original source · versioned page text
2022-05-16 General Committee Meeting Agenda
The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
With regard to application timeframes, decision was due 6 May and the applicant was asked
if they would agree to extend the decision-making timeframes until 19 May to allow the
application to be considered by Council. At the time of finalising the report, Council officers
had not received a response to this request.
2.2. Site Description
The site is relatively flat and is a corner allotment with an extensive frontage to Railway
Parade. An existing exchange building is located at the south eastern corner, which has
emergency generator and equipment rooms, lunchroom and amenities. An unloading area
and parking area is adjacent to and near the exchange building. A demountable building,
which was the former exchange building, is located towards the middle of the site and near
the western boundary.
The site is turfed, but has minimal existing vegetation with the exception of the mature
vegetation in the south eastern corner of the site. Two rural driveways access the site from
the east and the north.
2.3. Surrounding Land Uses
The site is situated within an existing and established residential area situated north of the
Pomona township. The North Coast Railway line is located to the west of the site and
dwellings adjoin the site to the south and west.
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017;
Noosa Plan 2020.
3.2. State and Other Statutory Instruments
State Planning Policy
Noosa Plan 2020 is generally consistent with the State Planning Policy July 2017 (SPP) and
the SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The proposal is for urban activity within the Urban Footprint and is consistent with the
assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of Noosa Plan 2020 to the extent the
provisions are relevant to the development. The following codes are particularly relevant:
Density Zone Code;
Hinterland Villages Local Plan Code;
Infrastructure Utilities Code; and
Works Codes.
Page 23 of 96
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.