Original source · versioned page text
2022-05-16 General Committee Meeting Agenda
The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 16 MAY 2022
Project – Project Restoration Plan prepared by The Nature Conservancy dated
January 2022.
5. All works must be undertaken in accordance with Maritime Safety Queensland
(MSQ) and Department of Agriculture and Fisheries (DAF) requirements relating
to signage and aids to navigation as detailed in the Noosa Oyster Restoration
Project – Project Restoration Plan (Section 7) prepared by The Nature
Conservancy dated January 2022.
6. All works must be undertaken in accordance with DAF requirements relating to
notifications, marking of approved boundary areas and restoration of marine
plants/tidal profiles that are temporarily impacted as a result of the works as
detailed in the SARA Decision Notice.
7. All works must be undertaken in accordance with Best Practice Erosion and
Sediment Control (BPESC) guidelines for Australia (International Erosion Control
Association).
8. All works must be undertaken in accordance with Sections 6.1 and 6.4 of Noosa
Oyster Ecosystem Restoration Project - Project Restoration Plan prepared by
The Nature Conservancy Australia dated January 2022.
9. All works must be undertaken in accordance with the current Queensland Acid
Sulfate Soil Technical Manual: Soil management guidelines, prepared by the
Department of Science, Information Technology, Innovation and the Arts, 2014.
10. All materials used for construction works must be clean materials to ensure that
the works do not contaminate the waterway.
11. All structures must be designed and constructed such that they are free standing
within the waterway and are not connected to or behind the revetment wall.
12. All structures must have no detrimental effects on stormwater drains and/or
easements.
13. In the event of collapse or failure of structural integrity of the oyster restoration
substrates, the works must be removed from the waterway or reconstructed in
accordance with this development approval.
14. All works must be undertaken in accordance with an approved Construction
Environmental Management Plan (CEMP) which consolidates the commitments
and management measures described in the Noosa Oyster Ecosystem
Restoration Project – Project Restoration Plan including, but not limited to:
a. A Site Management Plan which describes environmental management
measures at the proposed load out site including details of stockpile
management;
b. An Erosion and Sediment Control Plan (ESCP) in accordance with BPESC
guidelines;
c. A Marine Plant and Water Quality Monitoring Plan designed to monitor the
composition of marine plant assemblages at habitat restoration sites and
appropriate sites upstream and downstream; and
d. A Marine Biosecurity Management Plan for construction vessels.
The CEMP should be submitted to Council for approval 20 business days prior
to the commencement of works.
15. A monitoring report must be provided to Council on a six-monthly basis for the
first year (and annually for the following 4 years) following completion of
construction works which details the results of restoration monitoring and
evaluation, including adaptive management measures taken and the success or
otherwise of those measures.
Page 42 of 96
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.