Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2022-05-16 General Committee Meeting Agenda

of 96

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                   16 MAY 2022


             Project – Project Restoration Plan prepared by The Nature Conservancy dated
             January 2022.
       5.    All works must be undertaken in accordance with Maritime Safety Queensland
             (MSQ) and Department of Agriculture and Fisheries (DAF) requirements relating
             to signage and aids to navigation as detailed in the Noosa Oyster Restoration
             Project – Project Restoration Plan (Section 7) prepared by The Nature
             Conservancy dated January 2022.
       6.    All works must be undertaken in accordance with DAF requirements relating to
             notifications, marking of approved boundary areas and restoration of marine
             plants/tidal profiles that are temporarily impacted as a result of the works as
             detailed in the SARA Decision Notice.
       7.    All works must be undertaken in accordance with Best Practice Erosion and
             Sediment Control (BPESC) guidelines for Australia (International Erosion Control
             Association).
       8.    All works must be undertaken in accordance with Sections 6.1 and 6.4 of Noosa
             Oyster Ecosystem Restoration Project - Project Restoration Plan prepared by
             The Nature Conservancy Australia dated January 2022.
       9.    All works must be undertaken in accordance with the current Queensland Acid
             Sulfate Soil Technical Manual: Soil management guidelines, prepared by the
             Department of Science, Information Technology, Innovation and the Arts, 2014.
       10.   All materials used for construction works must be clean materials to ensure that
             the works do not contaminate the waterway.
       11.   All structures must be designed and constructed such that they are free standing
             within the waterway and are not connected to or behind the revetment wall.
       12.   All structures must have no detrimental effects on stormwater drains and/or
             easements.
       13.   In the event of collapse or failure of structural integrity of the oyster restoration
             substrates, the works must be removed from the waterway or reconstructed in
             accordance with this development approval.
       14.   All works must be undertaken in accordance with an approved Construction
             Environmental Management Plan (CEMP) which consolidates the commitments
             and management measures described in the Noosa Oyster Ecosystem
             Restoration Project – Project Restoration Plan including, but not limited to:
             a.    A Site Management Plan which describes environmental management
                   measures at the proposed load out site including details of stockpile
                   management;
             b.    An Erosion and Sediment Control Plan (ESCP) in accordance with BPESC
                   guidelines;
             c.    A Marine Plant and Water Quality Monitoring Plan designed to monitor the
                   composition of marine plant assemblages at habitat restoration sites and
                   appropriate sites upstream and downstream; and
             d.    A Marine Biosecurity Management Plan for construction vessels.
             The CEMP should be submitted to Council for approval 20 business days prior
             to the commencement of works.
       15.   A monitoring report must be provided to Council on a six-monthly basis for the
             first year (and annually for the following 4 years) following completion of
             construction works which details the results of restoration monitoring and
             evaluation, including adaptive management measures taken and the success or
             otherwise of those measures.
                                                                                  Page 42 of 96
Log in to download the original file

2022-05-16 General Committee Meeting Agenda(PDF, 18MB).pdf · 18.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.