Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2022-05-16 General Committee Meeting Agenda

of 96

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                 16 MAY 2022




                                  Figure 5: - Noosa Sound West Site

   The proposed restoration sites have been subject to the following assessments and studies:
   a)   Bathymetric mapping
   b)   Marine and intertidal habitat mapping
   c)   River user analysis
   d)   Habitat suitability modelling
   e)   Restoration suitability modelling
   f)   Community consultation
   g)   Detailed site engineering
   These assessments/reports were submitted by the applicant as part of the application and
   where relevant have been reviewed by Marine Approval Specialists as part of the
   Assessment Manager Development Assessment process.
   The applicant has also submitted a comprehensive Project Restoration Plan and this is
   included as Attachment 2 to this report.
   The application material includes a range of environmental management and monitoring
   commitments, primarily documented in the Noosa Oyster Ecosystem Restoration Project -
   Project Restoration Plan. These management and monitoring commitments include:
   -    Installation of signage and aids to navigation to ensure public safety and safe passage
        of vessels
   -    Minimising or completely avoiding impacts to intertidal vegetation (mangroves and
        saltmarshes) and seabed vegetation (seagrass and macroalgae)
   -    Avoiding impacts to or buffering of existing tidal works
   -    Development of a Monitoring, Evaluation and Reporting (MER) System
   -    Development of a Construction Environmental Management Plan (CEMP)




                                                                                Page 46 of 96
Log in to download the original file

2022-05-16 General Committee Meeting Agenda(PDF, 18MB).pdf · 18.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.