Skip to the record
Accept no substitutions.

Original source · versioned page text

2022-05-16 General Committee Meeting Agenda

of 96

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2022




                                   Page 75 of 96

GENERAL COMMITTEE MEETING AGENDA                                                                        16 MAY 2022

             Corporate Plan Key  Operational Initiatives       Outcomes                  Responsible     Update                                       Status Q2     is)
             Focus Areas                                                                 Areas/Officers
             2.4 Continue to     Continue the construction of | Completion of site      Director        Construction of new Peregian Beach Community | Ontrack | Behind
             support our         Stage 3 of the Rufous Street | constructionand the new | Community      House nearing completion. Green Space                   Schedule
             community to utilise | project incl. the construction | neighbourhood centre Services      complete. Transition to new building to occur
             Council controlled  of the new Peregian Beach     which will strengthen                    early in 2022. Concept design for refit of old
             land and buildings  Community House.              community connection                     community house drafted. Awaiting finalization of
             through formal                                                                             defects on new Community House before
             tenure                                                                                      practical completion achieved.
            arrangements         Increase Community Grants | Improved community          Community      Completed — two grant rounds had and additional | Completed) Completed
                                 programme                     participation and social  Development/ | Alliance recipients.
                                                              benefits                   Community
                                                                                         Development
                                                                                         Manager
                                 Sunshine Beach skate ramp | Improved design to better | Infrastructure Awarded design and construct contract January | Ontrack | Ontrack
                                 renewal                       integrate skate facilities Planning Design| 2022.
                                                               with surrounding          & Delivery,    Council design reviews early April 2022 and Final
                                                               infrastructure and        Infrastructure | design forecast late April 2022.
                                                               environment              Planning        Construction forecast May and June 2022.
                                                                                         Design &
                                                                                         Delivery
                                                                                         Manager
                                 Kin Kin Recreational Centre | Increased community      Property/       Stage 1 works have been completed and the     Ontrack | Ontrack
                                 Renewal                       connection and responsible) Property      magnitude of damage caused by the Microbat
                                                               management of assets     Manager         guano was less than expected.
                                                                                                        Stage 2 and 3 works have commenced mid-
                                                                                                         February and will proceed for approx. 3 months
                                 Progress the implementation | Strategic direction for the | Community  Commenced implementation of                   Ontrack | Ontrack
                                 of the Master Plans for the   development and           Development/ | recommendations.
                                 Noosa District Sports         implementation of sport   Community    | Concept design for redevelopment of Cooroy
                                 Complex and Cooroy Sports | and recreation facilities   Development | Sports Complex.
                                 Complex                                                Manager          Resurfacing Noosa District Network courts.
                                                                                                         Undertaking feasibility study of Regen Wellbeing
                                                                                                         Hub.
             2.5 Planand build | Continue      with       the Completion by the endof | Infrastructure   Playground achieved practical completion 25  Behind     On track
             an iconic all       construction     of      the | 2021 to increase         Planning Design| March 2022, with minor landscaping impacts from) Schedule
             abilities playground | Cooroy/Hinterland     All-| interaction and          & Delivery/     February 2022 floods being managed.
             at Cooroy           Abilities Playground          inclusiveness                    ae       Public opening forecast 13 April 2022 with a
                                                                                         Design &       formal opening 6 May 2022.
                                                                                         Delivery
                                                                                         Manager

                                                                                                       Page 75 of 96
Log in to download the original file

2022-05-16 General Committee Meeting Agenda(PDF, 18MB).pdf · 18.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.