2022-05-16 General Committee Meeting Agenda

of 96

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   16 MAY 2022




                                   Page 83 of 96

GENERAL COMMITTEE MEETING AGENDA                                                                            16 MAY 2022

             Corporate Plan Key   Operational Initiatives        Outcomes                    Responsible      Update                                         Status Q2    ek)
             Focus Areas                                                                     Areas/Officers
                                                                                                              Tewantin Lake Doonella bridge is undergoing
                                                                                                              options analysis for remediation and final report
                                                                                                              due late April 2022.
                                                                                                              Garth Prowd bridge completed options
                                                                                                              assessment for remediation and pathway
                                                                                                              widening. Tender to be released April 2022
                                                                                                              Shire pedestrian bridges, Alec Loveday and
                                                                                                              Cooroy Gumtree for remediation are in planning
                                                                                                              and environmental approvals pending.
                                  Asset management renewal | Maintenance of assets to        Asset Planning/ | Delivery of Shire Level 3 Bridge and Structure On track | On track
                                  program                        required standards and      Asset Planning condition assessments currently underway.
                                                                 achievement of sustainable | Coordinator | shire reseal program currently over 75%
                                                                 outcomes in safety,                          deli   d   and invoiced
                                                                 minimising lifecycle and                      a
                                                                 project delivery costs                       Shire Stormwater CCTV Condition Assessment
                                                                                                              program underway.
                                  Noosa Heads Parade Corridor] Improve community              Infrastructure  Noosa Parade corridor upgrade contractor       Ontrack | On track
                                  storm water drainage upgrade} connectivity and create a    Planning,        construction site mobilisation impacted by
                                                                 collective vision. Foster   Design &         February 2022 flood; contractor completed
                                                                 successful social networks | Delivery/       mobillisation and preliminaries onsite March 2022,
                                                                 and benefit multiple        Infrastructure | Construction completion forecast 31 Oct 2022
                                                                 stakeholders                Planning         prior to Triathlon event.
                                                                                             Design &
                                                                                             Delivery Mgr

                                                                                                          Page 83 of 96
Log in to download the original file

2022-05-16 General Committee Meeting Agenda(PDF, 18MB).pdf · 18.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.