ORDINARY MEETING AGENDA 21 JUNE 2018
14. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste
Management) Regulation 2000, for the storage and collection of refuse.
15. Public bins must be provided to reduce littering. All bins provided must be for
refuse and recycling and be decanted into the bulk bins by the site operators.
ENGINEERING
Site Access and Driveways
16. Sealed access driveways must be maintained from Main Street to all parking
and manoeuvring areas of the development.
Car Parking
17. A minimum of 5 car parking spaces must be provided and marked on the site
and made available and accessible at all times while the use is open for
business. The carparking must include in particular:
a. provision of vandal resistant public lighting with intensities to satisfy the
requirements of Australian Standard AS1158: Public Lighting Code
b. 1 disabled parking space/s within the total
c. dimensions, crossfalls and gradients in accordance with the relevant
Australian Standard (AS/NZS2890.1:2004 for staff and customers,
AS/NZS2890.6:2009 for people with disabilities).
18. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all
times.
Stormwater Drainage
19. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
Earthworks and Retaining Walls
20. All earthworks and associated batters must be contained entirely within the
subject site unless written permission from the respective landowner(s) is
provided to Council. All earthworks must be undertaken in accordance with the
provisions of Australian Standard AS3798: Guidelines on Earthworks for
Commercial and Residential Developments.
Damage to Services and Assets
21. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority for
approval.
B. Agree to reduce the Infrastructure Charge payable for the proposed development to
$17,472 based on the approved operating days as conditioned.
C. Note the report is provided in accordance with Section 63(5) of the Planning Act
2016.
Carried.
Cr Stockwell voted in favour of the motion.
Page 20 of 35
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.